X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495082808020

Well Details

Well ID: 0495082808020
Loading map...
Location: 02/08-28-049-08W5/0
Location Alias: 02/08-28-49-08 W5M
Location Alias 2: 02/08-28-049-08 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 08
Section: 28
County/Municipality: Brazeau County
Well Name: DAYLIGHT PEMBINA 8-28-49-8
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0268311
License Date: 2002-03-04
License Status: Suspension
Spud Date: 2002-03-17
Final Drill Date: 2002-04-08
Well Total Depth: 2486.50 m
Surface Hole Latitude: 53.257601
Surface Hole Longitude: -115.102499

For data sources see[1][2]

Well History

Date Event
2002-03-04 Obtained License
2002-03-19 Surface Casing Operation Performed
2002-04-02 Well Log Performed
2002-04-03 Production Casing Operation Performed
2002-04-04 Rig Released
2002-04-04 Well Mode changed to Drilled and Cased
2002-04-08 Finished Drilling
2002-04-09 Perforation Treatment Performed - Open-Hole Completion
2002-04-25 Well Began Production
2002-04-25 Well Fluid changed to Crude Oil
2002-04-25 Well Mode changed to Flowing
2007-03-22 Well Fluid changed to Crude Oil
2007-03-22 Well Mode changed to Pumping
2007-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-29 Well Log Performed
2007-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-04-01 Well Fluid changed to Crude Oil
2014-04-01 Well Mode changed to Suspended
2014-06-18 Well Log Performed
2014-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-06-19 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-04-09 Open Hole/Barefoot Completion 2477.00 2486.50 0
2007-03-24 Acid Treatment 2477.00 2486.50 0
2007-12-14 Acid Treatment 2477.00 2486.50 0
2008-06-18 Acid Treatment 2477.00 2486.50 0
2014-06-19 Cement Squeeze 2477.00 2486.50 0
2014-06-19 Packing Device Capped w/Cement 2360.00 2470.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 808 0.0 0.0 0.0
2003 5973 0.0 0.0 0.0
2004 7110 0.0 0.0 0.0
2005 7784 0.0 0.0 0.0
2006 7107 0.0 0.0 0.0
2007 4030 0.0 0.0 0.0
2008 6046 0.0 0.0 0.0
2009 8398 0.0 0.0 0.0
2010 8543 0.0 0.0 0.0
2011 8498 0.0 0.0 0.0
2012 7998 0.0 0.0 0.0
2013 1227 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-06-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References