X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495090116000

Well Details

Well ID: 0495090116000
Loading map...
Location: 00/16-01-049-09W5/0
Location Alias: 00/16-01-49-09 W5M
Location Alias 2: 00/16-01-049-09 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 09
Section: 01
County/Municipality: Brazeau County
Well Name: SAXON IN PEMBINA 16-1-49-9
Operator Name: Obsidian Energy Ltd.
License Number: 0014537
License Date: 1958-01-08
License Status: Issued
Spud Date: 1958-01-24
Final Drill Date: 1958-02-07
Well Total Depth: 1583.40 m
Surface Hole Latitude: 53.205560
Surface Hole Longitude: -115.174244

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-01-08 Obtained License
1958-02-05 Drill Stem Test Performed
1958-02-07 Finished Drilling
1958-02-07 Well Mode changed to Drilled and Cased
1958-02-08 Production Casing Operation Performed
1958-02-10 Perforation Treatment Performed - Bullet Perforation
1958-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-02-25 Perforation Treatment Performed - Fractured
1958-02-25 Perforation Treatment Performed - Jet Perforation
1958-03-10 Well Began Production
1958-03-10 Well Fluid changed to Crude Oil
1958-03-10 Well Mode changed to Flowing
1966-12-30 Well Began Injection
1966-12-30 Well Fluid changed to Water
1966-12-30 Well Type changed to Injection
1988-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-02-10 Bullet Perforation 1549.30 1551.40 20
1958-02-10 Bullet Perforation 1554.50 1556.90 20
1958-02-25 Acid Treatment 1549.30 1556.90 0
1958-02-25 Perforation 1549.30 1552.30 13
1958-02-25 Perforation 1554.50 1556.90 13
1958-02-25 Acid Treatment 1549.30 1556.90 0
1958-02-25 Fracture 1549.30 1556.90 0
1988-04-14 Acid Treatment 1549.30 1556.90 0
1988-04-29 Acid Treatment 1549.30 1556.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

References