X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495091108000

Well Details

Well ID: 0495091108000
Loading map...
Location: 00/08-11-049-09W5/0
Location Alias: 00/08-11-49-09 W5M
Location Alias 2: 00/08-11-049-09 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 09
Section: 11
County/Municipality: Brazeau County
Well Name: PAN AM-HUDSON'S BAY PEMBINA B-13
Operator Name: Obsidian Energy Ltd.
License Number: 0008751
License Date: 1954-11-19
License Status: RecCertified
Spud Date: 1954-11-21
Final Drill Date: 1954-12-09
Well Total Depth: 1549.90 m
Surface Hole Latitude: 53.212397
Surface Hole Longitude: -115.199305

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-11-19 Obtained License
1954-12-09 Finished Drilling
1954-12-09 Well Mode changed to Drilled and Cased
1954-12-10 Production Casing Operation Performed
1954-12-19 Perforation Treatment Performed - Open-Hole Completion
1954-12-22 Perforation Treatment Performed - Fractured
1954-12-30 Well Began Production
1954-12-30 Well Fluid changed to Crude Oil
1954-12-30 Well Mode changed to Flowing
1955-02-10 Well Fluid changed to Crude Oil
1955-02-10 Well Mode changed to Pumping
1955-03-27 Perforation Treatment Performed - Fractured
1958-10-27 Perforation Treatment Performed - Fractured
1994-08-01 Well Fluid changed to Crude Oil
1994-08-01 Well Mode changed to Suspended
1997-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-21 Perforation Treatment Performed - Jet Perforation
1997-03-21 Plug Back Performed
1997-03-21 Well Log Performed
1997-04-01 Perforation Treatment Performed - Remedial Casing
1997-07-10 Well Abandoned
1997-07-10 Well Fluid changed to Crude Oil
1997-07-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-12-19 Open Hole/Barefoot Completion 1534.70 1549.90 0
1954-12-22 Fracture 1534.70 1549.90 0
1955-03-27 Fracture 1534.70 1549.90 0
1958-10-27 Fracture 1534.70 1549.90 0
1997-03-21 Packing Device Capped w/Cement 1511.00 1519.00 0
1997-03-21 Perforation 415.00 416.00 13
1997-04-01 Remedial Casing Cementing 415.00 416.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7943 0.0 0.0 0.0
1968 7919 0.0 0.0 0.0
1969 8567 0.0 0.0 0.0
1970 8376 0.0 0.0 0.0
1971 8687 0.0 0.0 0.0
1972 8063 0.0 0.0 0.0
1973 8495 0.0 0.0 0.0
1974 8239 0.0 0.0 0.0
1975 8493 0.0 0.0 0.0
1976 8484 0.0 0.0 0.0
1977 8490 0.0 0.0 0.0
1978 8055 0.0 0.0 0.0
1979 8344 0.0 0.0 0.0
1980 6347 0.0 0.0 0.0
1981 7657 0.0 0.0 0.0
1982 8043 0.0 0.0 0.0
1983 8088 0.0 0.0 0.0
1984 8508 0.0 0.0 0.0
1985 8225 0.0 0.0 0.0
1986 6743 0.0 0.0 0.0
1987 8714 0.0 0.0 0.0
1988 8179 0.0 0.0 0.0
1989 8616 0.0 0.0 0.0
1990 6924 0.0 0.0 0.0
1991 8050 0.0 0.0 0.0
1992 2184 0.0 0.0 0.0

For data sources see[5]

References