X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495092411000

Well Details

Well ID: 0495092411000
Loading map...
Location: 00/11-24-049-09W5/0
Location Alias: 00/11-24-49-09 W5M
Location Alias 2: 00/11-24-049-09 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 09
Section: 24
County/Municipality: Brazeau County
Well Name: PENN WEST HZ PEMBINA 11-24-49-9
Operator Name: Obsidian Energy Ltd.
License Number: 0474939
License Date: 2015-03-09
License Status: Issued
Spud Date: 2015-08-23
Final Drill Date: 2015-09-01
Well Total Depth: 3956.50 m
Surface Hole Latitude: 53.248012
Surface Hole Longitude: -115.223911

For data sources see[1][2]

Well History

Date Event
2015-03-09 Obtained License
2015-08-24 Surface Casing Operation Performed
2015-08-25 Direction Drilling Operation Performed - Deviate
2015-08-26 Direction Drilling Operation Performed - Horizontal
2015-08-26 Well Log Performed
2015-09-01 Finished Drilling
2015-09-01 Well Log Performed
2015-09-01 Well Mode changed to Drilled and Cased
2015-09-02 Production Casing Operation Performed
2015-09-02 Rig Released
2015-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-11 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-12 Well Began Production
2015-10-12 Well Fluid changed to Crude Oil
2015-10-12 Well Mode changed to Flowing
2015-10-15 Well Log Performed
2015-12-01 Well Fluid changed to Crude Oil
2015-12-01 Well Mode changed to Pumping
2018-01-20 Well Log Performed
2018-03-05 Well Began Injection
2018-03-05 Well Fluid changed to Water
2018-03-05 Well Type changed to Injection

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-08-23 Nabors Drilling Limited 26 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-08-25 1248.00 Deviate (5 - 79 degrees)
2015-08-26 1673.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-10-10 Multi-Stage Fracture 3915.00 3915.10 0
2015-10-10 Multi-Stage Fracture 3069.00 3069.10 0
2015-10-10 Multi-Stage Fracture 2980.60 2980.70 0
2015-10-11 Multi-Stage Fracture 2893.10 2893.20 0
2015-10-11 Multi-Stage Fracture 2805.50 2805.60 0
2015-10-11 Multi-Stage Fracture 2721.80 2721.90 0
2015-10-11 Multi-Stage Fracture 2635.70 2635.80 0
2015-10-11 Multi-Stage Fracture 2547.40 2547.50 0
2015-10-11 Multi-Stage Fracture 2458.30 2458.40 0
2015-10-11 Multi-Stage Fracture 2372.70 2372.80 0
2015-10-11 Multi-Stage Fracture 2283.50 2283.60 0
2015-10-10 Multi-Stage Fracture 3830.00 3830.10 0
2015-10-11 Multi-Stage Fracture 2199.70 2199.80 0
2015-10-11 Multi-Stage Fracture 2111.40 2111.50 0
2015-10-11 Multi-Stage Fracture 2023.20 2023.30 0
2015-10-11 Multi-Stage Fracture 1940.30 1940.40 0
2015-10-11 Multi-Stage Fracture 1851.30 1851.40 0
2015-10-11 Multi-Stage Fracture 1766.90 1767.00 0
2015-10-11 Multi-Stage Fracture 1677.80 1677.90 0
2015-10-10 Multi-Stage Fracture 3748.20 3748.30 0
2015-10-10 Multi-Stage Fracture 3650.40 3650.50 0
2015-10-10 Multi-Stage Fracture 3547.20 3547.30 0
2015-10-10 Multi-Stage Fracture 3447.70 3447.80 0
2015-10-10 Multi-Stage Fracture 3344.60 3344.70 0
2015-10-10 Multi-Stage Fracture 3245.20 3245.30 0
2015-10-10 Multi-Stage Fracture 3156.10 3156.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-10 2015-10-11 1,549 2,837 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.2597 N/A
water Not Available 100 86.0408 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 11.7506 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0133 N/A
dibromoacetonitrile 3252-43-5 100 0.0133 N/A
non-hazardous ingredients Not Available 100 0.0133 N/A
polyethylene glycol 25322-68-3 100 0.0133 N/A
sodium bromide 7647-15-6 100 0.0133 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0089 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1504 N/A
non-hazardous ingredients Not Available 100 0.1504 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0471 N/A
propylene glycol 57-55-6 100 0.0471 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.1634 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.1634 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1634 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-10-02 2015-10-12 Surface Water - Runoff 3083

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1403 0.0 0.0 0.0
2016 8682 0.0 0.0 0.0
2017 8433 0.0 0.0 0.0
2018 408 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-02 No Incident Encountered 0.00 0.00
2015-10-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References