X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495092816020

Well Details

Well ID: 0495092816020
Loading map...
Location: 02/16-28-049-09W5/0
Location Alias: 02/16-28-49-09 W5M
Location Alias 2: 02/16-28-049-09 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 09
Section: 28
County/Municipality: Brazeau County
Well Name: PENN WEST 102 HZ PEMBINA 16-28-49-9
Operator Name: Obsidian Energy Ltd.
License Number: 0466662
License Date: 2014-05-15
License Status: Amended
Spud Date: 2014-12-29
Final Drill Date: 2015-01-07
Well Total Depth: 4010.00 m
Surface Hole Latitude: 53.262330
Surface Hole Longitude: -115.212148

For data sources see[1][2]

Well History

Date Event
2014-05-15 Obtained License
2014-12-30 Surface Casing Operation Performed
2015-01-01 Direction Drilling Operation Performed - Deviate
2015-01-01 Direction Drilling Operation Performed - Horizontal
2015-01-01 Well Log Performed
2015-01-07 Finished Drilling
2015-01-07 Well Log Performed
2015-01-07 Well Mode changed to Drilled and Cased
2015-01-08 Production Casing Operation Performed
2015-01-08 Rig Released
2015-01-24 Well Log Performed
2015-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-30 Perforation Treatment Performed - Open-Hole Completion
2015-02-01 Well Began Production
2015-02-01 Well Fluid changed to Crude Oil
2015-02-01 Well Mode changed to Flowing
2015-03-29 Well Fluid changed to Crude Oil
2015-03-29 Well Mode changed to Pumping
2015-10-15 Well Log Performed
2015-10-16 Well Log Performed
2015-11-24 Well Began Injection
2015-11-24 Well Fluid changed to Water
2015-11-24 Well Type changed to Injection

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-12-29 Precision Drilling Corporation 148 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-01 1250.00 Deviate (5 - 79 degrees)
2015-01-01 1652.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-30 Open Hole/Barefoot Completion 4008.00 4010.00 0
2015-01-30 Multi-Stage Fracture 3195.90 3196.00 0
2015-01-30 Multi-Stage Fracture 3089.60 3089.70 0
2015-01-30 Multi-Stage Fracture 2993.70 2993.80 0
2015-01-30 Multi-Stage Fracture 2900.50 2900.60 0
2015-01-30 Multi-Stage Fracture 2806.40 2806.50 0
2015-01-30 Multi-Stage Fracture 2710.80 2710.90 0
2015-01-30 Multi-Stage Fracture 2620.90 2621.00 0
2015-01-30 Multi-Stage Fracture 2514.50 2514.60 0
2015-01-30 Multi-Stage Fracture 2418.80 2418.90 0
2015-01-30 Multi-Stage Fracture 2327.30 2327.40 0
2015-01-30 Multi-Stage Fracture 3959.70 3959.80 0
2015-01-30 Multi-Stage Fracture 2231.50 2231.60 0
2015-01-30 Multi-Stage Fracture 2138.50 2138.60 0
2015-01-30 Multi-Stage Fracture 2045.70 2045.80 0
2015-01-30 Multi-Stage Fracture 1949.80 1949.90 0
2015-01-30 Multi-Stage Fracture 1854.00 1854.10 0
2015-01-30 Multi-Stage Fracture 1748.10 1748.20 0
2015-01-30 Multi-Stage Fracture 3863.90 3864.00 0
2015-01-30 Multi-Stage Fracture 3768.10 3768.20 0
2015-01-30 Multi-Stage Fracture 3672.30 3672.40 0
2015-01-30 Multi-Stage Fracture 3577.20 3577.30 0
2015-01-30 Multi-Stage Fracture 3481.40 3481.50 0
2015-01-30 Multi-Stage Fracture 3387.20 3387.30 0
2015-01-30 Multi-Stage Fracture 3291.50 3291.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-30 2015-01-30 1,535 2,927 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.6524 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 13.5121 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0845 N/A
Methanol 67-56-1 100 0.0845 N/A
Water 7732-18-5 100 0.0845 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0052 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.1786 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 3.4 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.1669 N/A
Oxyalkylated alcohol 9014 100 0.1669 N/A
Petroleum distillates 64742-47-8 100 0.1669 N/A
Polyacrylate 9014 100 0.1669 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-23 2015-01-30 Surface Water - Runoff 3045

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3121 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-01-08 No Incident Encountered 0.00 0.00
2015-02-05 No Incident Encountered 0.00 0.00
2015-10-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References