If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495093013020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.264424,"lon":-115.286046,"icon":""}]} |
| Location: 02/13-30-049-09W5/0 | |
| Location Alias: 02/13-30-49-09 W5M | |
| Location Alias 2: 02/13-30-049-09 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 09 | |
| Section: 30 | |
| County/Municipality: Brazeau County | |
| Well Name: PENN WEST 102 HZ PEMBINA 13-30-49-9 | |
| Operator Name: Obsidian Energy Ltd. | |
| License Number: 0468171 | |
| License Date: 2014-07-17 | |
| License Status: Issued | |
| Spud Date: 2014-12-10 | |
| Final Drill Date: 2014-12-17 | |
| Well Total Depth: 3572.00 m | |
| Surface Hole Latitude: 53.264424 | |
| Surface Hole Longitude: -115.286046 |
| Date | Event |
|---|---|
| 2014-07-17 | Obtained License |
| 2014-12-11 | Surface Casing Operation Performed |
| 2014-12-12 | Direction Drilling Operation Performed - Deviate |
| 2014-12-13 | Direction Drilling Operation Performed - Horizontal |
| 2014-12-13 | Well Log Performed |
| 2014-12-16 | Well Log Performed |
| 2014-12-17 | Finished Drilling |
| 2014-12-17 | Well Mode changed to Drilled and Cased |
| 2014-12-18 | Production Casing Operation Performed |
| 2014-12-18 | Rig Released |
| 2015-02-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-02-07 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-02-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-02-13 | Well Began Production |
| 2015-02-13 | Well Fluid changed to Crude Oil |
| 2015-02-13 | Well Log Performed |
| 2015-02-13 | Well Mode changed to Flowing |
| 2015-03-23 | Well Fluid changed to Crude Oil |
| 2015-03-23 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-12-10 | Precision Drilling Corporation | 196 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-12-12 | 1330.00 | Deviate (5 - 79 degrees) |
| 2014-12-13 | 1733.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-02-07 | Open Hole/Barefoot Completion | 3569.30 | 3572.00 | 0 |
| 2015-02-07 | Multi-Stage Fracture | 2848.80 | 2848.90 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 2753.00 | 2753.10 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 2670.70 | 2670.80 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 2588.40 | 2588.50 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 2506.70 | 2506.80 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 2410.90 | 2411.00 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 2328.60 | 2328.70 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 2246.30 | 2246.40 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 2164.00 | 2164.10 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 2081.70 | 2081.80 | 0 |
| 2015-02-07 | Multi-Stage Fracture | 3521.90 | 3522.00 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 1985.90 | 1986.00 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 1892.00 | 1892.10 | 0 |
| 2015-02-08 | Multi-Stage Fracture | 1796.10 | 1796.20 | 0 |
| 2015-02-07 | Multi-Stage Fracture | 3441.10 | 3441.20 | 0 |
| 2015-02-07 | Multi-Stage Fracture | 3358.80 | 3358.90 | 0 |
| 2015-02-07 | Multi-Stage Fracture | 3274.90 | 3275.00 | 0 |
| 2015-02-07 | Multi-Stage Fracture | 3190.40 | 3190.50 | 0 |
| 2015-02-07 | Multi-Stage Fracture | 3094.50 | 3094.60 | 0 |
| 2015-02-07 | Multi-Stage Fracture | 3012.20 | 3012.30 | 0 |
| 2015-02-07 | Multi-Stage Fracture | 2930.10 | 2930.20 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-02-07 | 2015-02-08 | 1,612 | 2,791 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 84.3998 | N/A | |||
| FRAC SAND. 20/40 WHITE (OTTAWA TYPE) | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 12.2867 | N/A | ||
| 2K7 Solution W-M | Baker Hughes | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0872 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0872 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0872 | N/A | ||||
| Breaker N | Baker Hughes | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.006 | N/A | |
| CC-2 | Baker Hughes | Clay Control | Non-hazardous | Not Available | 100 | 0.187 | N/A | |
| Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 2.8333 | N/A | |
| MaxPerm-20A | Baker Hughes | Friction Reducer | Non-hazardous | 9014 | 100 | 0.1997 | N/A | |
| Oxyalkylated alcohol | 9014 | 100 | 0.1997 | N/A | ||||
| Petroleum distillates | 64742-47-8 | 100 | 0.1997 | N/A | ||||
| Polyacrylate | 9014 | 100 | 0.1997 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-02-01 | 2015-02-08 | Surface Water - Runoff | 2791 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 6563 | 0.0 | 0.0 | 0.0 |
| 2016 | 8481 | 0.0 | 0.0 | 0.0 |
| 2017 | 7532 | 0.0 | 0.0 | 0.0 |
| 2018 | 8663 | 0.0 | 0.0 | 0.0 |
| 2019 | 8495 | 0.0 | 0.0 | 0.0 |
| 2020 | 2052 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-12-18 | No Incident Encountered | 0.00 | 0.00 |
| 2015-02-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]