X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495100816000

Well Details

Well ID: 0495100816000
Loading map...
Location: 00/16-08-049-10W5/0
Location Alias: 00/16-08-49-10 W5M
Location Alias 2: 00/16-08-049-10 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 10
Section: 08
County/Municipality: Brazeau County
Well Name: PENN WEST PEMBINA 16-8-49-10
Operator Name: Obsidian Energy Ltd.
License Number: 0011482
License Date: 1956-05-29
License Status: Suspension
Spud Date: 1956-09-11
Final Drill Date: 1956-09-23
Well Total Depth: 1738.60 m
Surface Hole Latitude: 53.219658
Surface Hole Longitude: -115.418735

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-05-29 Obtained License
1956-09-23 Finished Drilling
1956-09-23 Well Mode changed to Drilled and Cased
1956-09-24 Production Casing Operation Performed
1956-09-25 Perforation Treatment Performed - Bullet Perforation
1956-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-01 Perforation Treatment Performed - Fractured
1956-10-04 Well Began Production
1956-10-04 Well Fluid changed to Crude Oil
1956-10-04 Well Mode changed to Flowing
1957-01-30 Well Fluid changed to Crude Oil
1957-01-30 Well Mode changed to Pumping
1969-02-06 Perforation Treatment Performed - Fractured
2002-02-13 Perforation Treatment Performed - Jet Perforation
2002-02-13 Well Log Performed
2002-02-14 Perforation Treatment Performed - Fractured
2017-12-01 Well Fluid changed to Crude Oil
2017-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-09-25 Bullet Perforation 1705.10 1707.80 26
2002-02-13 Perforation 1704.50 1708.50 20
2002-02-14 Fracture 1704.00 1713.00 0
1956-09-25 Bullet Perforation 1708.40 1709.00 26
1956-09-25 Bullet Perforation 1709.30 1709.90 26
1956-09-25 Bullet Perforation 1710.20 1710.80 26
1956-09-25 Bullet Perforation 1712.10 1712.70 26
1956-09-25 Bullet Perforation 1713.00 1713.90 26
1956-10-01 Acid Treatment 1713.00 1713.90 0
1956-10-01 Fracture 1713.00 1713.90 0
1969-02-06 Fracture 1705.10 1712.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8440 0.0 0.0 0.0
1968 8591 0.0 0.0 0.0
1969 8245 0.0 0.0 0.0
1970 8616 0.0 0.0 0.0
1971 8342 0.0 0.0 0.0
1972 8387 0.0 0.0 0.0
1973 8522 0.0 0.0 0.0
1974 7745 0.0 0.0 0.0
1975 7851 0.0 0.0 0.0
1976 7929 0.0 0.0 0.0
1977 8323 0.0 0.0 0.0
1978 8452 0.0 0.0 0.0
1979 8382 0.0 0.0 0.0
1980 8503 0.0 0.0 0.0
1981 7927 0.0 0.0 0.0
1982 7939 0.0 0.0 0.0
1983 8451 0.0 0.0 0.0
1984 8589 0.0 0.0 0.0
1985 8333 0.0 0.0 0.0
1986 7780 0.0 0.0 0.0
1987 8337 0.0 0.0 0.0
1988 7408 0.0 0.0 0.0
1989 3399 0.0 0.0 0.0
1990 6051 0.0 0.0 0.0
1991 7546 0.0 0.0 0.0
1992 8315 0.0 0.0 0.0
1993 7222 0.0 0.0 0.0
1994 7535 0.0 0.0 0.0
1995 8007 0.0 0.0 0.0
1996 7577 0.0 0.0 0.0
1997 8120 0.0 0.0 0.0
1998 8426 0.0 0.0 0.0
1999 8687 0.0 0.0 0.0
2000 8235 0.0 0.0 0.0
2001 7543 0.0 0.0 0.0
2002 8166 0.0 0.0 0.0
2003 8180 0.0 0.0 0.0
2004 8067 0.0 0.0 0.0
2005 8689 0.0 0.0 0.0
2006 8231 0.0 0.0 0.0
2007 7504 0.0 0.0 0.0
2008 7967 0.0 0.0 0.0
2009 7795 0.0 0.0 0.0
2010 2309 0.0 0.0 0.0
2011 2685 0.0 0.0 0.0
2012 2780 0.0 0.0 0.0
2013 5802 0.0 0.0 0.0
2014 5444 0.0 0.0 0.0
2015 5087 0.0 0.0 0.0

For data sources see[5]

References