X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495103304020

Well Details

Well ID: 0495103304020
Loading map...
Location: 02/04-33-049-10W5/0
Location Alias: 02/04-33-49-10 W5M
Location Alias 2: 02/04-33-049-10 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 10
Section: 33
County/Municipality: Brazeau County
Well Name: WESTBRICK HZ PEMBINA 4-33-49-10
Operator Name: Westbrick Energy Ltd.
License Number: 0467826
License Date: 2014-07-03
License Status: Amended
Spud Date: 2014-07-10
Final Drill Date: 2014-07-24
Well Total Depth: 3800.00 m
Surface Hole Latitude: 53.251727
Surface Hole Longitude: -115.411986

For data sources see[1][2]

Well History

Date Event
2014-07-03 Obtained License
2014-07-12 Surface Casing Operation Performed
2014-07-15 Direction Drilling Operation Performed - Deviate
2014-07-16 Direction Drilling Operation Performed - Horizontal
2014-07-16 Well Log Performed
2014-07-17 Intermediate Casing Operation Performed
2014-07-24 Finished Drilling
2014-07-24 Well Log Performed
2014-07-24 Well Mode changed to Drilled and Cased
2014-07-25 Liner Casing Operation Performed
2014-07-26 Rig Released
2014-08-05 Perforation Treatment Performed - Open-Hole Completion
2014-08-05 Well Log Performed
2014-08-11 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-07 Well Began Production
2014-11-07 Well Fluid changed to Gas
2014-11-07 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-07-15 1961.00 Deviate (5 - 79 degrees)
2014-07-16 2286.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-08-05 Open Hole/Barefoot Completion 3790.00 3800.00 0
2014-08-11 Multi-Stage Fracture 2979.10 2979.20 0
2014-08-11 Multi-Stage Fracture 2907.60 2907.70 0
2014-08-11 Multi-Stage Fracture 2836.40 2836.50 0
2014-08-11 Multi-Stage Fracture 2765.30 2765.40 0
2014-08-11 Multi-Stage Fracture 2693.60 2693.70 0
2014-08-11 Multi-Stage Fracture 2622.50 2622.60 0
2014-08-11 Multi-Stage Fracture 2523.30 2523.40 0
2014-08-11 Multi-Stage Fracture 2452.10 2452.20 0
2014-08-11 Multi-Stage Fracture 2381.60 2381.70 0
2014-08-11 Multi-Stage Fracture 3754.30 3754.40 0
2014-08-11 Multi-Stage Fracture 3566.20 3566.30 0
2014-08-11 Multi-Stage Fracture 3429.90 3430.00 0
2014-08-11 Multi-Stage Fracture 3358.80 3358.90 0
2014-08-11 Multi-Stage Fracture 3261.50 3261.60 0
2014-08-11 Multi-Stage Fracture 3189.90 3190.00 0
2014-08-11 Multi-Stage Fracture 3119.80 3119.90 0
2014-08-11 Multi-Stage Fracture 3050.30 3050.40 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-11 2014-08-11 2,194 1,909 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.9101 N/A
water Not Available 100 75.0856 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 4.0325 N/A
silica crystalline 14808-60-7 100 4.0325 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 14.2293 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.6658 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0093 N/A
dibromoacetonitrile 3252-43-5 100 0.0093 N/A
non-hazardous ingredients Not Available 100 0.0093 N/A
polyethylene glycol 25322-68-3 100 0.0093 N/A
sodium bromide 7647-15-6 100 0.0093 N/A
EnCap-HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0223 N/A
cured acrylic resin Not Available 100 0.0223 N/A
silica crystalline 14808-60-7 100 0.0223 N/A
GBE-1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0228 N/A
propylene glycol 57-55-6 100 0.0228 N/A
DRA-90 Trican Buffer non-hazardous ingredients Not Available 100 0.155 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1644 N/A
formic acid 64-18-6 100 0.1644 N/A
non-hazardous ingredients Not Available 100 0.1644 N/A
WXB-77 Trican Crosslinker borate salts 1319-33-1 100 0.375 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.375 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.2248 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.1238 N/A
isopropanol 67-63-0 100 0.1238 N/A
methanol 67-56-1 100 0.1239 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.1238 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.1238 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1312 0.0 0.0 0.0
2015 8365 0.0 0.0 0.0
2016 3984 0.0 0.0 0.0
2017 7151 0.0 0.0 0.0
2018 8730 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-26 No Incident Encountered 0.00 0.00
2014-08-24 No Incident Encountered 0.00 0.00

For data sources see[8]

References