X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495110103000

Well Details

Well ID: 0495110103000
Loading map...
Location: 00/03-01-049-11W5/0
Location Alias: 00/03-01-49-11 W5M
Location Alias 2: 00/03-01-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 01
County/Municipality: Brazeau County
Well Name: RIDGEBACK HZ PEMBINA 3-1-49-11
Operator Name: Ridgeback Resources Inc.
License Number: 0484769
License Date: 2017-07-31
License Status: Issued
Spud Date: 2017-08-30
Final Drill Date: 2017-09-07
Well Total Depth: 4291.00 m
Surface Hole Latitude: 53.194535
Surface Hole Longitude: -115.517254

For data sources see[1][2]

Well History

Date Event
2017-07-31 Obtained License
2017-09-01 Surface Casing Operation Performed
2017-09-02 Direction Drilling Operation Performed - Deviate
2017-09-03 Direction Drilling Operation Performed - Horizontal
2017-09-07 Finished Drilling
2017-09-07 Well Log Performed
2017-09-07 Well Mode changed to Drilled and Cased
2017-09-08 Well Log Performed
2017-09-09 Production Casing Operation Performed
2017-09-09 Rig Released
2017-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-26 Well Began Production
2017-10-26 Well Fluid changed to Crude Oil
2017-10-26 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-30 Precision Drilling Corporation 183 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-09-02 1462.10 Deviate (5 - 79 degrees)
2017-09-03 2022.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-24 Multi-Stage Fracture 4260.00 4260.10 0
2017-10-24 Multi-Stage Fracture 3814.50 3814.60 0
2017-10-24 Multi-Stage Fracture 3765.00 3765.10 0
2017-10-24 Multi-Stage Fracture 3715.50 3715.60 0
2017-10-24 Multi-Stage Fracture 3666.00 3666.10 0
2017-10-24 Multi-Stage Fracture 3616.50 3616.60 0
2017-10-24 Multi-Stage Fracture 3567.00 3567.10 0
2017-10-25 Multi-Stage Fracture 3517.50 3517.60 0
2017-10-25 Multi-Stage Fracture 3468.00 3468.10 0
2017-10-25 Multi-Stage Fracture 3418.50 3418.60 0
2017-10-25 Multi-Stage Fracture 3369.00 3369.10 0
2017-10-24 Multi-Stage Fracture 4210.50 4210.60 0
2017-10-25 Multi-Stage Fracture 3319.50 3319.60 0
2017-10-25 Multi-Stage Fracture 3270.00 3270.10 0
2017-10-25 Multi-Stage Fracture 3220.50 3220.60 0
2017-10-25 Multi-Stage Fracture 3171.00 3171.10 0
2017-10-25 Multi-Stage Fracture 3121.50 3121.60 0
2017-10-25 Multi-Stage Fracture 3072.00 3072.10 0
2017-10-25 Multi-Stage Fracture 3022.50 3022.60 0
2017-10-25 Multi-Stage Fracture 2973.00 2973.10 0
2017-10-25 Multi-Stage Fracture 2923.50 2923.60 0
2017-10-25 Multi-Stage Fracture 2874.00 2874.10 0
2017-10-24 Multi-Stage Fracture 4161.00 4161.10 0
2017-10-25 Multi-Stage Fracture 2824.50 2824.60 0
2017-10-25 Multi-Stage Fracture 2775.00 2775.10 0
2017-10-25 Multi-Stage Fracture 2725.50 2725.60 0
2017-10-25 Multi-Stage Fracture 2676.00 2676.10 0
2017-10-25 Multi-Stage Fracture 2626.50 2626.60 0
2017-10-25 Multi-Stage Fracture 2577.00 2577.10 0
2017-10-25 Multi-Stage Fracture 2527.50 2527.60 0
2017-10-25 Multi-Stage Fracture 2478.00 2478.10 0
2017-10-26 Multi-Stage Fracture 2428.50 2428.60 0
2017-10-26 Multi-Stage Fracture 2379.00 2379.10 0
2017-10-24 Multi-Stage Fracture 4111.50 4111.60 0
2017-10-26 Multi-Stage Fracture 2329.50 2329.60 0
2017-10-26 Multi-Stage Fracture 2280.00 2280.10 0
2017-10-26 Multi-Stage Fracture 2230.50 2230.60 0
2017-10-26 Multi-Stage Fracture 2181.00 2181.10 0
2017-10-26 Multi-Stage Fracture 2131.50 2131.60 0
2017-10-26 Multi-Stage Fracture 2082.00 2082.10 0
2017-10-24 Multi-Stage Fracture 4062.00 4062.10 0
2017-10-24 Multi-Stage Fracture 4012.50 4012.60 0
2017-10-24 Multi-Stage Fracture 3963.00 3963.10 0
2017-10-24 Multi-Stage Fracture 3913.50 3913.60 0
2017-10-24 Multi-Stage Fracture 3864.00 3864.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-24 2017-10-26 1,830 4,935 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 93.4657 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 6.5342 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0105 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0105 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0941 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0941 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0644 N/A
Tergitol 15-S-20 68131-40-8 100 0.0644 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-20 2017-10-24 Surface Water - River 7439
2017-10-24 2017-10-26 Central Water Distribution Facility 45

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1226 0.0 0.0 0.0
2018 8660 0.0 0.0 0.0
2019 8755 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-09 No Incident Encountered 0.00 0.00
2017-11-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References