If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495110103000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.194535,"lon":-115.517254,"icon":""}]} |
| Location: 00/03-01-049-11W5/0 | |
| Location Alias: 00/03-01-49-11 W5M | |
| Location Alias 2: 00/03-01-049-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 01 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK HZ PEMBINA 3-1-49-11 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0484769 | |
| License Date: 2017-07-31 | |
| License Status: Issued | |
| Spud Date: 2017-08-30 | |
| Final Drill Date: 2017-09-07 | |
| Well Total Depth: 4291.00 m | |
| Surface Hole Latitude: 53.194535 | |
| Surface Hole Longitude: -115.517254 |
| Date | Event |
|---|---|
| 2017-07-31 | Obtained License |
| 2017-09-01 | Surface Casing Operation Performed |
| 2017-09-02 | Direction Drilling Operation Performed - Deviate |
| 2017-09-03 | Direction Drilling Operation Performed - Horizontal |
| 2017-09-07 | Finished Drilling |
| 2017-09-07 | Well Log Performed |
| 2017-09-07 | Well Mode changed to Drilled and Cased |
| 2017-09-08 | Well Log Performed |
| 2017-09-09 | Production Casing Operation Performed |
| 2017-09-09 | Rig Released |
| 2017-10-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-10-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-10-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-10-26 | Well Began Production |
| 2017-10-26 | Well Fluid changed to Crude Oil |
| 2017-10-26 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-08-30 | Precision Drilling Corporation | 183 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-09-02 | 1462.10 | Deviate (5 - 79 degrees) |
| 2017-09-03 | 2022.60 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-10-24 | Multi-Stage Fracture | 4260.00 | 4260.10 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 3814.50 | 3814.60 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 3765.00 | 3765.10 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 3715.50 | 3715.60 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 3666.00 | 3666.10 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 3616.50 | 3616.60 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 3567.00 | 3567.10 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3517.50 | 3517.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3468.00 | 3468.10 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3418.50 | 3418.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3369.00 | 3369.10 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 4210.50 | 4210.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3319.50 | 3319.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3270.00 | 3270.10 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3220.50 | 3220.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3171.00 | 3171.10 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3121.50 | 3121.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3072.00 | 3072.10 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 3022.50 | 3022.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2973.00 | 2973.10 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2923.50 | 2923.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2874.00 | 2874.10 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 4161.00 | 4161.10 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2824.50 | 2824.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2775.00 | 2775.10 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2725.50 | 2725.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2676.00 | 2676.10 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2626.50 | 2626.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2577.00 | 2577.10 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2527.50 | 2527.60 | 0 |
| 2017-10-25 | Multi-Stage Fracture | 2478.00 | 2478.10 | 0 |
| 2017-10-26 | Multi-Stage Fracture | 2428.50 | 2428.60 | 0 |
| 2017-10-26 | Multi-Stage Fracture | 2379.00 | 2379.10 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 4111.50 | 4111.60 | 0 |
| 2017-10-26 | Multi-Stage Fracture | 2329.50 | 2329.60 | 0 |
| 2017-10-26 | Multi-Stage Fracture | 2280.00 | 2280.10 | 0 |
| 2017-10-26 | Multi-Stage Fracture | 2230.50 | 2230.60 | 0 |
| 2017-10-26 | Multi-Stage Fracture | 2181.00 | 2181.10 | 0 |
| 2017-10-26 | Multi-Stage Fracture | 2131.50 | 2131.60 | 0 |
| 2017-10-26 | Multi-Stage Fracture | 2082.00 | 2082.10 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 4062.00 | 4062.10 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 4012.50 | 4012.60 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 3963.00 | 3963.10 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 3913.50 | 3913.60 | 0 |
| 2017-10-24 | Multi-Stage Fracture | 3864.00 | 3864.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-10-24 | 2017-10-26 | 1,830 | 4,935 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 93.4657 | N/A | |||
| 30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.5342 | N/A | ||
| ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0105 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0105 | N/A | ||||
| ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0941 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0941 | N/A | ||||
| ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0644 | N/A | |
| Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0644 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-10-20 | 2017-10-24 | Surface Water - River | 7439 |
| 2017-10-24 | 2017-10-26 | Central Water Distribution Facility | 45 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 1226 | 0.0 | 0.0 | 0.0 |
| 2018 | 8660 | 0.0 | 0.0 | 0.0 |
| 2019 | 8755 | 0.0 | 0.0 | 0.0 |
| 2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-09-09 | No Incident Encountered | 0.00 | 0.00 |
| 2017-11-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]