X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495110406002

Well Details

Well ID: 0495110406002
Loading map...
Location: 00/06-04-049-11W5/2
Location Alias: 00/06-04-49-11 W5M
Location Alias 2: 00/06-04-049-11 W5/02
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 04
County/Municipality: Brazeau County
Well Name: WHITECAP PEMBINA 6-4-49-11
Operator Name: Whitecap Resources Inc.
License Number: 0093420
License Date: 1981-11-19
License Status: Suspension
Spud Date: 1981-12-14
Final Drill Date: 1982-01-04
Well Total Depth: 1827.00 m
Surface Hole Latitude: 53.196873
Surface Hole Longitude: -115.554594

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-19 Obtained License
1981-12-26 Drill Stem Test Performed
1981-12-27 Drill Stem Test Performed
1982-01-04 Finished Drilling
1982-01-04 Well Mode changed to Drilled and Cased
1982-01-06 Production Casing Operation Performed
1982-01-27 Perforation Treatment Performed - Jet Perforation
1982-01-28 Perforation Treatment Performed - Fractured
1984-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-03-22 Perforation Treatment Performed - Jet Perforation
1984-03-22 Well Log Performed
1984-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-23 Well Log Performed
1984-03-24 Perforation Treatment Performed - Cement Squeeze
1984-03-25 Perforation Treatment Performed - Jet Perforation
1984-03-25 Well Log Performed
1984-03-26 Perforation Treatment Performed - Fractured
1984-04-01 Well Began Production
1984-04-01 Well Fluid changed to Crude Oil
1984-04-01 Well Mode changed to Pumping
1984-07-31 Perforation Treatment Performed - Jet Perforation
1984-07-31 Well Fluid changed to Crude Oil
1984-07-31 Well Mode changed to Pumping
1984-08-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-01-27 Perforation 1774.00 1777.50 7
1984-07-31 Perforation 1774.00 1777.50 7
1984-07-31 Perforation 1783.50 1785.00 7
1982-01-27 Perforation 1783.50 1785.00 7
1982-01-28 Fracture 1774.00 1785.00 0
1984-03-22 Packing Device Capped w/Cement 1764.00 1764.00 0
1984-03-22 Perforation 1416.50 1417.00 13
1984-03-23 Acid Treatment 1416.50 1417.00 0
1984-03-24 Cement Squeeze 1416.50 1417.00 0
1984-03-25 Perforation 1410.50 1413.00 13
1984-03-26 Fracture 1410.50 1413.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 4694 0.0 0.0 0.0
1985 7281 0.0 0.0 0.0
1986 7817 0.0 0.0 0.0
1987 7829 0.0 0.0 0.0
1988 7316 0.0 0.0 0.0
1989 4045 0.0 0.0 0.0
1990 7548 0.0 0.0 0.0
1991 8102 0.0 0.0 0.0
1992 8082 0.0 0.0 0.0
1993 7727 0.0 0.0 0.0
1994 7710 0.0 0.0 0.0
1995 8391 0.0 0.0 0.0
1996 8170 0.0 0.0 0.0
1997 6887 0.0 0.0 0.0
1998 8219 0.0 0.0 0.0
1999 8746 0.0 0.0 0.0
2000 8191 0.0 0.0 0.0
2001 8438 0.0 0.0 0.0
2002 8388 0.0 0.0 0.0
2003 8408 0.0 0.0 0.0
2004 8312 0.0 0.0 0.0
2005 8496 0.0 0.0 0.0
2006 8495 0.0 0.0 0.0
2007 8303 0.0 0.0 0.0
2008 4920 0.0 0.0 0.0
2009 2070 0.0 0.0 0.0
2010 1360 0.0 0.0 0.0
2011 1502 0.0 0.0 0.0
2012 265 0.0 0.0 0.0
2013 4476 0.0 0.0 0.0
2014 24 0.0 0.0 0.0

For data sources see[5]

References