X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495110708020

Well Details

Well ID: 0495110708020
Loading map...
Location: 02/08-07-049-11W5/0
Location Alias: 02/08-07-49-11 W5M
Location Alias 2: 02/08-07-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 07
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 8-7-49-11
Operator Name: Ridgeback Resources Inc.
License Number: 0482444
License Date: 2017-01-18
License Status: Issued
Spud Date: 2018-01-17
Final Drill Date: 2018-01-26
Well Total Depth: 3728.00 m
Surface Hole Latitude: 53.210236
Surface Hole Longitude: -115.616992

For data sources see[1][2]

Well History

Date Event
2017-01-18 Obtained License
2018-01-18 Surface Casing Operation Performed
2018-01-19 Direction Drilling Operation Performed - Deviate
2018-01-20 Direction Drilling Operation Performed - Horizontal
2018-01-26 Finished Drilling
2018-01-26 Well Log Performed
2018-01-26 Well Mode changed to Drilled and Cased
2018-01-27 Production Casing Operation Performed
2018-01-27 Rig Released
2018-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-24 Well Began Production
2018-02-24 Well Fluid changed to Crude Oil
2018-02-24 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-17 Precision Drilling Corporation 183 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-19 1419.20 Deviate (5 - 79 degrees)
2018-01-20 2102.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-06 Multi-Stage Fracture 3701.30 3701.40 0
2018-02-07 Multi-Stage Fracture 3221.10 3221.20 0
2018-02-07 Multi-Stage Fracture 3192.30 3192.40 0
2018-02-07 Multi-Stage Fracture 3149.80 3149.90 0
2018-02-07 Multi-Stage Fracture 3107.40 3107.50 0
2018-02-07 Multi-Stage Fracture 3066.70 3066.80 0
2018-02-07 Multi-Stage Fracture 3024.90 3025.00 0
2018-02-07 Multi-Stage Fracture 2996.40 2996.50 0
2018-02-07 Multi-Stage Fracture 2955.10 2955.20 0
2018-02-07 Multi-Stage Fracture 2913.00 2913.10 0
2018-02-07 Multi-Stage Fracture 2870.60 2870.70 0
2018-02-06 Multi-Stage Fracture 3658.20 3658.30 0
2018-02-07 Multi-Stage Fracture 2829.50 2829.60 0
2018-02-07 Multi-Stage Fracture 2802.00 2802.10 0
2018-02-07 Multi-Stage Fracture 2761.00 2761.10 0
2018-02-07 Multi-Stage Fracture 2718.80 2718.90 0
2018-02-07 Multi-Stage Fracture 2676.10 2676.20 0
2018-02-07 Multi-Stage Fracture 2634.90 2635.00 0
2018-02-07 Multi-Stage Fracture 2606.40 2606.50 0
2018-02-09 Multi-Stage Fracture 2565.10 2565.20 0
2018-02-09 Multi-Stage Fracture 2525.00 2525.10 0
2018-02-09 Multi-Stage Fracture 2484.50 2484.60 0
2018-02-06 Multi-Stage Fracture 3616.10 3616.20 0
2018-02-09 Multi-Stage Fracture 2444.30 2444.40 0
2018-02-09 Multi-Stage Fracture 2401.90 2402.00 0
2018-02-09 Multi-Stage Fracture 2374.00 2374.10 0
2018-02-09 Multi-Stage Fracture 2332.40 2332.50 0
2018-02-09 Multi-Stage Fracture 2292.60 2292.70 0
2018-02-09 Multi-Stage Fracture 2250.20 2250.30 0
2018-02-09 Multi-Stage Fracture 2209.50 2209.60 0
2018-02-09 Multi-Stage Fracture 2168.20 2168.30 0
2018-02-09 Multi-Stage Fracture 2140.80 2140.90 0
2018-02-06 Multi-Stage Fracture 3573.50 3573.60 0
2018-02-06 Multi-Stage Fracture 3503.30 3503.40 0
2018-02-07 Multi-Stage Fracture 3377.30 3377.40 0
2018-02-07 Multi-Stage Fracture 3348.40 3348.50 0
2018-02-07 Multi-Stage Fracture 3306.10 3306.20 0
2018-02-07 Multi-Stage Fracture 3263.50 3263.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-06 2018-02-09 1,824 6,400 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 95.7113 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 2.9159 N/A
40/70 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 1.4098 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0097 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0097 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0927 N/A
Tergitol 15-S-20 68131-40-8 100 0.0927 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.1009 N/A
Methanol 67-56-1 100 0.1009 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.1009 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-06 2018-02-07 Surface Water - Runoff 6044
2018-02-04 2018-02-05 Surface Water - Runoff 3749

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7271 0.0 0.0 0.0
2019 8703 0.0 0.0 0.0
2020 2161 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-27 No Incident Encountered 0.00 0.00
2018-02-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References