X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495111604020

Well Details

Well ID: 0495111604020
Loading map...
Location: 02/04-16-049-11W5/0
Location Alias: 02/04-16-49-11 W5M
Location Alias 2: 02/04-16-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 16
County/Municipality: Brazeau County
Well Name: WHITECAP 02 PEMBINA 4-16-49-11
Operator Name: Whitecap Resources Inc.
License Number: 0474229
License Date: 2015-01-13
License Status: Amended
Spud Date: 2015-05-06
Final Drill Date: 2015-05-20
Well Total Depth: 4153.00 m
Surface Hole Latitude: 53.225343
Surface Hole Longitude: -115.522786

For data sources see[1][2]

Well History

Date Event
2015-01-13 Obtained License
2015-05-07 Surface Casing Operation Performed
2015-05-09 Direction Drilling Operation Performed - Deviate
2015-05-11 Direction Drilling Operation Performed - Horizontal
2015-05-11 Well Log Performed
2015-05-12 Intermediate Casing Operation Performed
2015-05-20 Finished Drilling
2015-05-20 Well Mode changed to Drilled and Cased
2015-05-21 Well Log Performed
2015-05-22 Liner Casing Operation Performed
2015-05-23 Rig Released
2015-05-25 Well Log Performed
2015-06-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-06 Perforation Treatment Performed - Open-Hole Completion
2015-06-07 Well Began Production
2015-06-07 Well Fluid changed to Crude Oil
2015-06-07 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-05-06 Precision Drilling Corporation 241 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-05-09 1239.80 Deviate (5 - 79 degrees)
2015-05-11 1896.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-06-06 Open Hole/Barefoot Completion 4148.00 4153.00 0
2015-06-06 Multi-Stage Fracture 3545.60 3545.70 0
2015-06-06 Multi-Stage Fracture 3475.20 3475.30 0
2015-06-06 Multi-Stage Fracture 3406.50 3406.60 0
2015-06-06 Multi-Stage Fracture 3336.70 3336.80 0
2015-06-06 Multi-Stage Fracture 3268.60 3268.70 0
2015-06-06 Multi-Stage Fracture 3199.60 3199.70 0
2015-06-06 Multi-Stage Fracture 3130.40 3130.50 0
2015-06-06 Multi-Stage Fracture 3061.70 3061.80 0
2015-06-06 Multi-Stage Fracture 2993.60 2993.70 0
2015-06-06 Multi-Stage Fracture 2926.50 2926.60 0
2015-06-06 Multi-Stage Fracture 4109.90 4110.00 0
2015-06-06 Multi-Stage Fracture 2856.90 2857.00 0
2015-06-06 Multi-Stage Fracture 2787.70 2787.80 0
2015-06-06 Multi-Stage Fracture 2706.80 2706.90 0
2015-06-06 Multi-Stage Fracture 2625.30 2625.40 0
2015-06-06 Multi-Stage Fracture 2543.80 2543.90 0
2015-06-06 Multi-Stage Fracture 2461.30 2461.40 0
2015-06-06 Multi-Stage Fracture 2379.80 2379.90 0
2015-06-06 Multi-Stage Fracture 2297.50 2297.60 0
2015-06-06 Multi-Stage Fracture 2213.40 2213.50 0
2015-06-06 Multi-Stage Fracture 2131.20 2131.30 0
2015-06-06 Multi-Stage Fracture 4027.90 4028.00 0
2015-06-06 Multi-Stage Fracture 2047.50 2047.60 0
2015-06-06 Multi-Stage Fracture 1965.10 1965.20 0
2015-06-06 Multi-Stage Fracture 3959.80 3959.90 0
2015-06-06 Multi-Stage Fracture 3890.70 3890.80 0
2015-06-06 Multi-Stage Fracture 3822.30 3822.40 0
2015-06-06 Multi-Stage Fracture 3753.50 3753.60 0
2015-06-06 Multi-Stage Fracture 3683.30 3683.40 0
2015-06-06 Multi-Stage Fracture 3613.90 3614.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-06-06 2015-06-06 1,788 4,256 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.398 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 3.1774 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.0245 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.3011 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0124 N/A
Water 7732-18-5 100 0.0131 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0782 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0906 N/A
Ethoxylated phenolic resin 8300 100 0.0931 N/A
Isobutyl ketone 8300 100 0.0908 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1156 N/A
Organic acid salts 1 8300 100 0.0906 N/A
Organic acid salts 2 8300 100 0.0919 N/A
Organic acid salts 3 8300 100 0.0931 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 2.6744 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0934 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-06-02 2015-06-06 Surface Water - Runoff 4786

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4511 0.0 0.0 0.0
2016 8713 0.0 0.0 0.0
2017 8699 0.0 0.0 0.0
2018 8490 0.0 0.0 0.0
2019 7988 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-23 No Incident Encountered 0.00 0.00
2015-06-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References