X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495111915000

Well Details

Well ID: 0495111915000
Loading map...
Location: 00/15-19-049-11W5/0
Location Alias: 00/15-19-49-11 W5M
Location Alias 2: 00/15-19-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 19
County/Municipality: Brazeau County
Well Name: BACCALIEU HZ PEMBINA 15-19-49-11
Operator Name: Baccalieu Energy Inc.
License Number: 0436064
License Date: 2011-08-16
License Status: Issued
Spud Date: 2011-08-30
Final Drill Date: 2011-09-11
Well Total Depth: 3127.00 m
Surface Hole Latitude: 53.236975
Surface Hole Longitude: -115.590203

For data sources see[1][2]

Well History

Date Event
2011-08-16 Obtained License
2011-08-31 Surface Casing Operation Performed
2011-09-02 Well Log Performed
2011-09-03 Direction Drilling Operation Performed - Horizontal
2011-09-06 Intermediate Casing Operation Performed
2011-09-11 Finished Drilling
2011-09-11 Well Mode changed to Drilled and Cased
2011-09-13 Liner Casing Operation Performed
2011-09-14 Perforation Treatment Performed - Open-Hole Completion
2011-09-14 Rig Released
2011-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-26 Well Began Production
2011-10-26 Well Fluid changed to Crude Oil
2011-10-26 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-03 1517.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-14 Open Hole/Barefoot Completion 3123.00 3127.00 0
2011-10-26 Multi-Stage Fracture 2437.80 2437.90 0
2011-10-26 Multi-Stage Fracture 2366.00 2366.10 0
2011-10-26 Multi-Stage Fracture 2294.90 2295.00 0
2011-10-26 Multi-Stage Fracture 2210.10 2210.20 0
2011-10-26 Multi-Stage Fracture 2125.50 2125.60 0
2011-10-26 Multi-Stage Fracture 2040.50 2040.60 0
2011-10-26 Multi-Stage Fracture 1968.50 1968.60 0
2011-10-25 Multi-Stage Fracture 3095.70 3095.80 0
2011-10-25 Multi-Stage Fracture 3048.90 3049.00 0
2011-10-25 Multi-Stage Fracture 2989.90 2990.00 0
2011-10-25 Multi-Stage Fracture 2904.10 2904.20 0
2011-10-25 Multi-Stage Fracture 2818.70 2818.80 0
2011-10-26 Multi-Stage Fracture 2733.10 2733.20 0
2011-10-26 Multi-Stage Fracture 2607.50 2607.60 0
2011-10-26 Multi-Stage Fracture 2536.40 2536.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1052 0.0 0.0 0.0
2012 8633 0.0 0.0 0.0
2013 8633 0.0 0.0 0.0
2014 8568 0.0 0.0 0.0
2015 8542 0.0 0.0 0.0
2016 8739 0.0 0.0 0.0
2017 8747 0.0 0.0 0.0
2018 8471 0.0 0.0 0.0
2019 8713 0.0 0.0 0.0
2020 2166 0.0 0.0 0.0

For data sources see[6]

References