X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495112001030

Well Details

Well ID: 0495112001030
Loading map...
Location: 03/01-20-049-11W5/0
Location Alias: 03/01-20-49-11 W5M
Location Alias 2: 03/01-20-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 20
County/Municipality: Brazeau County
Well Name: WHITECAP PEMBINA 1-20-49-11
Operator Name: Whitecap Resources Inc.
License Number: 0494412
License Date: 2019-05-09
License Status: Amended
Spud Date: 2020-01-03
Final Drill Date: 2020-01-26
Well Total Depth: 4634.00 m
Surface Hole Latitude: 53.239340
Surface Hole Longitude: -115.519851

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2020-01-17 890.71 Deviate (5 - 79 degrees)
2020-01-20 1903.30 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-01 Open Hole/Barefoot Completion 4632.00 4634.00 0
2020-03-02 Multi-Stage Fracture 4084.00 4084.10 0
2020-03-02 Multi-Stage Fracture 4029.00 4029.10 0
2020-03-02 Multi-Stage Fracture 3974.20 3974.30 0
2020-03-02 Multi-Stage Fracture 3919.30 3919.40 0
2020-03-02 Multi-Stage Fracture 3864.50 3864.60 0
2020-03-02 Multi-Stage Fracture 3810.00 3810.10 0
2020-03-02 Multi-Stage Fracture 3755.20 3755.30 0
2020-03-02 Multi-Stage Fracture 3701.50 3701.60 0
2020-03-02 Multi-Stage Fracture 3646.60 3646.70 0
2020-03-02 Multi-Stage Fracture 3591.70 3591.80 0
2020-03-01 Multi-Stage Fracture 4586.70 4586.80 0
2020-03-02 Multi-Stage Fracture 3538.00 3538.10 0
2020-03-02 Multi-Stage Fracture 3483.20 3483.30 0
2020-03-02 Multi-Stage Fracture 3430.60 3430.70 0
2020-03-02 Multi-Stage Fracture 3376.20 3376.30 0
2020-03-02 Multi-Stage Fracture 3321.90 3322.00 0
2020-03-02 Multi-Stage Fracture 3267.90 3268.00 0
2020-03-04 Multi-Stage Fracture 3212.40 3212.50 0
2020-03-04 Multi-Stage Fracture 3158.50 3158.60 0
2020-03-04 Multi-Stage Fracture 3103.20 3103.30 0
2020-03-04 Multi-Stage Fracture 3048.20 3048.30 0
2020-03-01 Multi-Stage Fracture 4530.20 4530.30 0
2020-03-04 Multi-Stage Fracture 2993.70 2993.80 0
2020-03-04 Multi-Stage Fracture 2938.60 2938.70 0
2020-03-04 Multi-Stage Fracture 2884.50 2884.60 0
2020-03-04 Multi-Stage Fracture 2829.70 2829.80 0
2020-03-04 Multi-Stage Fracture 2775.10 2775.20 0
2020-03-04 Multi-Stage Fracture 2720.60 2720.70 0
2020-03-04 Multi-Stage Fracture 2666.60 2666.70 0
2020-03-04 Multi-Stage Fracture 2611.50 2611.60 0
2020-03-04 Multi-Stage Fracture 2557.30 2557.40 0
2020-03-04 Multi-Stage Fracture 2502.90 2503.00 0
2020-03-01 Multi-Stage Fracture 4463.00 4463.10 0
2020-03-04 Multi-Stage Fracture 2447.60 2447.70 0
2020-03-04 Multi-Stage Fracture 2393.90 2394.00 0
2020-03-04 Multi-Stage Fracture 2339.50 2339.60 0
2020-03-04 Multi-Stage Fracture 2287.40 2287.50 0
2020-03-04 Multi-Stage Fracture 2139.20 2139.30 0
2020-03-04 Multi-Stage Fracture 2032.90 2033.00 0
2020-03-04 Multi-Stage Fracture 1977.90 1978.00 0
2020-03-01 Multi-Stage Fracture 4397.40 4397.50 0
2020-03-01 Multi-Stage Fracture 4329.90 4330.00 0
2020-03-02 Multi-Stage Fracture 4261.70 4261.80 0
2020-03-02 Multi-Stage Fracture 4192.60 4192.70 0
2020-03-02 Multi-Stage Fracture 4137.10 4137.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 384 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-07 No Incident Encountered 0.00 0.00
2020-01-28 No Incident Encountered 0.00 0.00
2020-03-01 No Incident Encountered 0.00 0.00

For data sources see[6]

References