If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495120204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.196806,"lon":-115.632345,"icon":""}]} |
Location: 00/04-02-049-12W5/0 | |
Location Alias: 00/04-02-49-12 W5M | |
Location Alias 2: 00/04-02-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 02 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 4-2-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0460552 | |
License Date: 2013-10-30 | |
License Status: Issued | |
Spud Date: 2014-01-06 | |
Final Drill Date: 2014-01-16 | |
Well Total Depth: 3521.00 m | |
Surface Hole Latitude: 53.196806 | |
Surface Hole Longitude: -115.632345 |
Date | Event |
---|---|
2013-10-30 | Obtained License |
2014-01-07 | Surface Casing Operation Performed |
2014-01-10 | Direction Drilling Operation Performed - Deviate |
2014-01-12 | Direction Drilling Operation Performed - Horizontal |
2014-01-16 | Finished Drilling |
2014-01-16 | Well Log Performed |
2014-01-16 | Well Mode changed to Drilled and Cased |
2014-01-18 | Production Casing Operation Performed |
2014-01-19 | Perforation Treatment Performed - Open-Hole Completion |
2014-01-19 | Rig Released |
2014-02-05 | Well Log Performed |
2014-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-02-15 | Well Began Production |
2014-02-15 | Well Fluid changed to Crude Oil |
2014-02-15 | Well Mode changed to Flowing |
2014-02-18 | Well Log Performed |
2014-04-05 | Well Fluid changed to Crude Oil |
2014-04-05 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-01-06 | Precision Drilling Corporation | 403 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-01-10 | 1525.80 | Deviate (5 - 79 degrees) |
2014-01-12 | 2053.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-01-19 | Open Hole/Barefoot Completion | 3518.50 | 3521.00 | 0 |
2014-02-13 | Multi-Stage Fracture | 2924.70 | 2924.80 | 0 |
2014-02-13 | Multi-Stage Fracture | 2855.30 | 2855.40 | 0 |
2014-02-13 | Multi-Stage Fracture | 2784.10 | 2784.20 | 0 |
2014-02-13 | Multi-Stage Fracture | 2691.60 | 2691.70 | 0 |
2014-02-14 | Multi-Stage Fracture | 2647.90 | 2648.00 | 0 |
2014-02-14 | Multi-Stage Fracture | 2564.40 | 2564.50 | 0 |
2014-02-14 | Multi-Stage Fracture | 2497.90 | 2498.00 | 0 |
2014-02-14 | Multi-Stage Fracture | 2429.90 | 2430.00 | 0 |
2014-02-14 | Multi-Stage Fracture | 2351.30 | 2351.40 | 0 |
2014-02-14 | Multi-Stage Fracture | 2176.00 | 2176.10 | 0 |
2014-02-13 | Multi-Stage Fracture | 3497.50 | 3497.60 | 0 |
2014-02-13 | Multi-Stage Fracture | 3422.90 | 3423.00 | 0 |
2014-02-13 | Multi-Stage Fracture | 3353.50 | 3353.60 | 0 |
2014-02-13 | Multi-Stage Fracture | 3273.90 | 3274.00 | 0 |
2014-02-13 | Multi-Stage Fracture | 3205.00 | 3205.10 | 0 |
2014-02-13 | Multi-Stage Fracture | 3135.70 | 3135.80 | 0 |
2014-02-13 | Multi-Stage Fracture | 3065.50 | 3065.60 | 0 |
2014-02-13 | Multi-Stage Fracture | 2982.60 | 2982.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-02-13 | 2014-02-14 | 1,884 | 2,164 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 81.2822 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 3.5871 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.4013 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.9048 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0157 | N/A | |
Water | 7732-18-5 | 100 | 0.0165 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1932 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0917 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0941 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0919 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1107 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0917 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0932 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0941 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 6.309 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0671 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-02-06 | 2014-02-08 | Surface Water - Runoff | 2228 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 6882 | 0.0 | 0.0 | 0.0 |
2015 | 8420 | 0.0 | 0.0 | 0.0 |
2016 | 8664 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8509 | 0.0 | 0.0 | 0.0 |
2019 | 8740 | 0.0 | 0.0 | 0.0 |
2020 | 2157 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-01-19 | No Incident Encountered | 0.00 | 0.00 |
2014-02-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]