If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495121908000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.242915,"lon":-115.757986,"icon":""}]} |
Location: 00/08-19-049-12W5/0 | |
Location Alias: 00/08-19-49-12 W5M | |
Location Alias 2: 00/08-19-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 19 | |
County/Municipality: Yellowhead County | |
Well Name: MANCAL PEMBINA 8-19-49-12 | |
Operator Name: Mancal Energy Inc. | |
License Number: 0475763 | |
License Date: 2015-06-11 | |
License Status: Issued | |
Spud Date: 2015-08-19 | |
Final Drill Date: 2015-08-27 | |
Well Total Depth: 3916.00 m | |
Surface Hole Latitude: 53.242915 | |
Surface Hole Longitude: -115.757986 |
Date | Event |
---|---|
2015-06-11 | Obtained License |
2015-08-20 | Direction Drilling Operation Performed - Deviate |
2015-08-20 | Surface Casing Operation Performed |
2015-08-23 | Direction Drilling Operation Performed - Horizontal |
2015-08-27 | Finished Drilling |
2015-08-27 | Well Log Performed |
2015-08-27 | Well Mode changed to Drilled and Cased |
2015-08-28 | Production Casing Operation Performed |
2015-08-29 | Rig Released |
2015-11-11 | Well Log Performed |
2015-11-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-11-17 | Perforation Treatment Performed - Open-Hole Completion |
2015-12-01 | Well Began Production |
2015-12-01 | Well Fluid changed to Gas |
2015-12-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-08-19 | Chinook Drilling Inc. | 11 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-08-20 | 679.80 | Deviate (5 - 79 degrees) |
2015-08-23 | 2588.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-11-17 | Open Hole/Barefoot Completion | 3885.00 | 3916.00 | 0 |
2015-11-17 | Multi-Stage Fracture | 3333.60 | 3333.70 | 0 |
2015-11-17 | Multi-Stage Fracture | 3237.00 | 3237.10 | 0 |
2015-11-17 | Multi-Stage Fracture | 3140.30 | 3140.40 | 0 |
2015-11-17 | Multi-Stage Fracture | 3043.50 | 3043.60 | 0 |
2015-11-17 | Multi-Stage Fracture | 2960.40 | 2960.50 | 0 |
2015-11-17 | Multi-Stage Fracture | 2863.70 | 2863.80 | 0 |
2015-11-17 | Multi-Stage Fracture | 2726.80 | 2726.90 | 0 |
2015-11-17 | Multi-Stage Fracture | 3880.30 | 3880.40 | 0 |
2015-11-17 | Multi-Stage Fracture | 3833.90 | 3834.00 | 0 |
2015-11-17 | Multi-Stage Fracture | 3764.40 | 3764.50 | 0 |
2015-11-17 | Multi-Stage Fracture | 3694.80 | 3694.90 | 0 |
2015-11-17 | Multi-Stage Fracture | 3625.40 | 3625.50 | 0 |
2015-11-17 | Multi-Stage Fracture | 3555.80 | 3555.90 | 0 |
2015-11-17 | Multi-Stage Fracture | 3486.30 | 3486.40 | 0 |
2015-11-17 | Multi-Stage Fracture | 3416.70 | 3416.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-11-17 | 2015-11-17 | 2,474 | 2,130 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 79.6792 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 10.0423 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 2.8134 | N/A | ||
50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.1262 | N/A | ||
DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0134 | N/A | |
Water | 7732-18-5 | 100 | 0.0138 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0918 | N/A | |
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 7.4183 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0769 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-11-03 | 2015-11-04 | Surface Water - Runoff | 2520 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 703 | 0.0 | 0.0 | 0.0 |
2016 | 8766 | 0.0 | 0.0 | 0.0 |
2017 | 8740 | 0.0 | 0.0 | 0.0 |
2018 | 8724 | 0.0 | 0.0 | 0.0 |
2019 | 8635 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-08-29 | No Incident Encountered | 0.00 | 0.00 |
2015-11-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]