X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495122207000

Well Details

Well ID: 0495122207000
Loading map...
Location: 00/07-22-049-12W5/0
Location Alias: 00/07-22-49-12 W5M
Location Alias 2: 00/07-22-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 22
County/Municipality: Yellowhead County
Well Name: 1107882 ACC PEMBINA 7-22-49-12
Operator Name: Obsidian Energy Ltd.
License Number: 0126199
License Date: 1987-03-20
License Status: Issued
Spud Date: 1987-03-27
Final Drill Date: 1987-06-18
Well Total Depth: 3115.00 m
Surface Hole Latitude: 53.240985
Surface Hole Longitude: -115.666945

For data sources see[1][2]

Well History

Date Event
1987-03-20 Obtained License
1987-03-31 Surface Casing Operation Performed
1987-04-25 Direction Drilling Operation Performed - Deviate
1987-05-17 Plug Back Performed
1987-05-20 Direction Drilling Operation Performed - Sidetrack Fish
1987-05-29 Well Log Performed
1987-05-30 Well Log Performed
1987-05-31 Intermediate Casing Operation Performed
1987-06-18 Finished Drilling
1987-06-18 Well Log Performed
1987-06-18 Well Mode changed to Drilled and Cased
1987-06-19 Well Log Performed
1987-06-20 Liner Casing Operation Performed
1987-06-20 Lost Circulation Occurred
1987-06-23 Rig Released
1987-07-12 Well Log Performed
1987-07-13 Well Log Performed
1987-07-21 Perforation Treatment Performed - Jet Perforation
1987-07-24 Well Log Performed
1987-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-04 Perforation Treatment Performed - Cement Plug
1987-08-06 Perforation Treatment Performed - Jet Perforation
1987-08-06 Well Log Performed
1987-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-11 Well Began Production
1987-08-11 Well Fluid changed to Crude Oil
1987-08-11 Well Mode changed to Pumping
1987-09-22 Well Log Performed
1987-09-27 Perforation Treatment Performed - Jet Perforation
1987-09-27 Well Log Performed
1987-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-24 Perforation Treatment Performed - Cement Squeeze
1990-10-07 Perforation Treatment Performed - Cement Squeeze
1990-10-11 Well Log Performed
1990-10-14 Perforation Treatment Performed - Jet Perforation
1991-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-29 Well Log Performed
1992-06-03 Well Log Performed
1992-07-29 Well Log Performed
2007-04-14 Well Log Performed
2017-09-13 Well Log Performed
2017-09-14 Perforation Treatment Performed - Jet Perforation
2017-09-14 Well Log Performed
2017-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-08-02 Perforation Treatment Performed - Cement Squeeze
2018-08-06 Perforation Treatment Performed - Jet Perforation
2018-08-06 Well Log Performed
2018-08-07 Well Log Performed
2018-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1987-04-25 2510.00 Deviate (5 - 79 degrees)
1987-05-20 2676.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-07-21 Perforation 3042.00 3053.00 13
1990-10-14 Perforation 3042.00 3053.00 13
1991-04-30 Acid Treatment 3042.00 3053.00 0
2017-09-14 Perforation 2987.00 2991.00 17
2017-09-14 Perforation 2976.50 2981.50 17
2017-09-14 Perforation 2969.50 2974.50 17
2017-09-14 Perforation 2962.50 2967.50 17
2017-09-14 Perforation 2959.50 2961.00 17
2017-09-19 Acid Treatment 2987.00 2991.00 0
2017-09-20 Acid Treatment 2959.50 2991.00 0
2018-08-02 Cement Squeeze 2959.50 2991.00 0
1987-07-25 Acid Treatment 3042.00 3053.00 0
2018-08-06 Perforation 3035.00 3040.00 17
2018-08-08 Acid Treatment 3035.00 3040.00 0
1987-08-04 Cement Plug 3036.50 3039.80 0
1987-08-06 Perforation 3023.00 3034.00 13
1987-08-07 Acid Treatment 3023.00 3034.00 0
1987-09-27 Perforation 3012.00 3018.00 13
1987-10-04 Acid Treatment 3012.00 3018.00 0
1990-09-24 Cement Squeeze 3012.00 3018.00 0
1990-10-07 Cement Squeeze 3023.00 3034.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2307 0.0 0.0 0.0
1988 8170 0.0 0.0 0.0
1989 8480 0.0 0.0 0.0
1990 6182 0.0 0.0 0.0
1991 8017 0.0 0.0 0.0
1992 8252 0.0 0.0 0.0
1993 7874 0.0 0.0 0.0
1994 7939 0.0 0.0 0.0
1995 8191 0.0 0.0 0.0
1996 8180 0.0 0.0 0.0
1997 8626 0.0 0.0 0.0
1998 8346 0.0 0.0 0.0
1999 8556 0.0 0.0 0.0
2000 8587 0.0 0.0 0.0
2001 6741 0.0 0.0 0.0
2002 6487 0.0 0.0 0.0
2004 890 0.0 0.0 0.0
2005 7827 0.0 0.0 0.0
2006 8409 0.0 0.0 0.0
2007 6496 0.0 0.0 0.0
2008 8529 0.0 0.0 0.0
2009 7737 0.0 0.0 0.0
2010 7859 0.0 0.0 0.0
2011 8622 0.0 0.0 0.0
2012 8578 0.0 0.0 0.0
2013 8393 0.0 0.0 0.0
2014 8321 0.0 0.0 0.0
2015 8249 0.0 0.0 0.0
2016 768 0.0 0.0 0.0
2018 3254 0.0 0.0 0.0
2019 6941 0.0 0.0 0.0
2020 2074 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-06-20 Lost Circulation 3115.00 3115.00
2017-09-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References