If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495122415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.234067,"lon":-115.617861,"icon":""}]} |
Location: 00/15-24-049-12W5/0 | |
Location Alias: 00/15-24-49-12 W5M | |
Location Alias 2: 00/15-24-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 24 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 15-24-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0447100 | |
License Date: 2012-07-11 | |
License Status: Issued | |
Spud Date: 2012-08-14 | |
Final Drill Date: 2012-08-27 | |
Well Total Depth: 3505.00 m | |
Surface Hole Latitude: 53.234067 | |
Surface Hole Longitude: -115.617861 |
Date | Event |
---|---|
2012-07-11 | Obtained License |
2012-08-04 | Well Log Performed |
2012-08-15 | Surface Casing Operation Performed |
2012-08-15 | Well Log Performed |
2012-08-17 | Direction Drilling Operation Performed - Deviate |
2012-08-18 | Direction Drilling Operation Performed - Horizontal |
2012-08-25 | Well Log Performed |
2012-08-26 | Production Casing Operation Performed |
2012-08-27 | Finished Drilling |
2012-08-27 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-27 | Rig Released |
2012-08-27 | Well Mode changed to Drilled and Cased |
2012-09-16 | Well Log Performed |
2012-10-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-08 | Well Began Production |
2012-10-08 | Well Fluid changed to Crude Oil |
2012-10-08 | Well Mode changed to Flowing |
2012-10-15 | Well Log Performed |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-14 | Ironhand Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-17 | 1490.00 | Deviate (5 - 79 degrees) |
2012-08-18 | 1989.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-27 | Open Hole/Barefoot Completion | 3500.00 | 3505.00 | 0 |
2012-10-07 | Multi-Stage Fracture | 2890.20 | 2890.30 | 0 |
2012-10-07 | Multi-Stage Fracture | 2815.00 | 2815.10 | 0 |
2012-10-07 | Multi-Stage Fracture | 2739.40 | 2739.50 | 0 |
2012-10-07 | Multi-Stage Fracture | 2677.30 | 2677.40 | 0 |
2012-10-07 | Multi-Stage Fracture | 2600.80 | 2600.90 | 0 |
2012-10-07 | Multi-Stage Fracture | 2525.00 | 2525.10 | 0 |
2012-10-07 | Multi-Stage Fracture | 2450.00 | 2450.10 | 0 |
2012-10-07 | Multi-Stage Fracture | 2374.40 | 2374.50 | 0 |
2012-10-07 | Multi-Stage Fracture | 2299.10 | 2299.20 | 0 |
2012-10-07 | Multi-Stage Fracture | 2237.30 | 2237.40 | 0 |
2012-10-05 | Multi-Stage Fracture | 3474.40 | 3474.50 | 0 |
2012-10-07 | Multi-Stage Fracture | 2163.60 | 2163.70 | 0 |
2012-10-07 | Multi-Stage Fracture | 2089.00 | 2089.10 | 0 |
2012-10-05 | Multi-Stage Fracture | 3405.90 | 3406.00 | 0 |
2012-10-05 | Multi-Stage Fracture | 3329.90 | 3330.00 | 0 |
2012-10-05 | Multi-Stage Fracture | 3254.50 | 3254.60 | 0 |
2012-10-05 | Multi-Stage Fracture | 3179.00 | 3179.10 | 0 |
2012-10-06 | Multi-Stage Fracture | 3166.90 | 3167.00 | 0 |
2012-10-07 | Multi-Stage Fracture | 3040.80 | 3040.90 | 0 |
2012-10-07 | Multi-Stage Fracture | 2966.20 | 2966.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1215 | 0.0 | 0.0 | 0.0 |
2013 | 8544 | 0.0 | 0.0 | 0.0 |
2014 | 8605 | 0.0 | 0.0 | 0.0 |
2015 | 8651 | 0.0 | 0.0 | 0.0 |
2016 | 8576 | 0.0 | 0.0 | 0.0 |
2017 | 8546 | 0.0 | 0.0 | 0.0 |
2018 | 8724 | 0.0 | 0.0 | 0.0 |
2019 | 8372 | 0.0 | 0.0 | 0.0 |
2020 | 2105 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-27 | No Incident Encountered | 0.00 | 0.00 |
2012-10-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]