X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495123212000

Well Details

Well ID: 0495123212000
Loading map...
Location: 00/12-32-049-12W5/0
Location Alias: 00/12-32-49-12 W5M
Location Alias 2: 00/12-32-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 32
County/Municipality: Yellowhead County
Well Name: VERMILION HZ PEMBINA 12-32-49-12
Operator Name: Vermilion Energy Inc.
License Number: 0433725
License Date: 2011-05-25
License Status: Issued
Spud Date: 2011-08-13
Final Drill Date: 2011-08-22
Well Total Depth: 3445.00 m
Surface Hole Latitude: 53.271743
Surface Hole Longitude: -115.705329

For data sources see[1][2]

Well History

Date Event
2011-05-25 Obtained License
2011-08-15 Surface Casing Operation Performed
2011-08-15 Well Log Performed
2011-08-16 Direction Drilling Operation Performed - Horizontal
2011-08-22 Finished Drilling
2011-08-22 Well Mode changed to Drilled and Cased
2011-08-25 Production Casing Operation Performed
2011-08-25 Rig Released
2011-09-15 Well Log Performed
2011-09-17 Perforation Treatment Performed - Open-Hole Completion
2011-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-11 Well Began Production
2011-10-11 Well Fluid changed to Crude Oil
2011-10-11 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-16 1332.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-17 Open Hole/Barefoot Completion 3441.00 3445.00 0
2011-09-20 Multi-Stage Fracture 2826.30 2826.40 0
2011-09-21 Multi-Stage Fracture 2743.30 2743.40 0
2011-09-21 Multi-Stage Fracture 2673.60 2673.70 0
2011-09-21 Multi-Stage Fracture 2591.00 2591.10 0
2011-09-21 Multi-Stage Fracture 2521.60 2521.70 0
2011-09-21 Multi-Stage Fracture 2438.90 2439.00 0
2011-09-21 Multi-Stage Fracture 2369.20 2369.30 0
2011-09-21 Multi-Stage Fracture 2287.60 2287.70 0
2011-09-21 Multi-Stage Fracture 2217.90 2218.00 0
2011-09-21 Multi-Stage Fracture 2148.10 2148.20 0
2011-09-19 Multi-Stage Fracture 3416.50 3416.60 0
2011-09-19 Multi-Stage Fracture 3353.10 3353.20 0
2011-09-19 Multi-Stage Fracture 3283.30 3283.40 0
2011-09-19 Multi-Stage Fracture 3201.10 3201.20 0
2011-09-19 Multi-Stage Fracture 3131.40 3131.50 0
2011-09-20 Multi-Stage Fracture 3048.70 3048.80 0
2011-09-20 Multi-Stage Fracture 2979.00 2979.10 0
2011-09-20 Multi-Stage Fracture 2896.20 2896.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1606 0.0 0.0 0.0
2012 8544 0.0 0.0 0.0
2013 8636 0.0 0.0 0.0
2014 8573 0.0 0.0 0.0
2015 8747 0.0 0.0 0.0
2016 8554 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8428 0.0 0.0 0.0
2019 8698 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References