If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495123516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.272716,"lon":-115.660277,"icon":""}]} |
| Location: 00/16-35-049-12W5/0 | |
| Location Alias: 00/16-35-49-12 W5M | |
| Location Alias 2: 00/16-35-049-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 35 | |
| County/Municipality: Yellowhead County | |
| Well Name: BACCALIEU HZ PEMBINA 16-35-49-12 | |
| Operator Name: Baccalieu Energy Inc. | |
| License Number: 0474374 | |
| License Date: 2015-01-23 | |
| License Status: Issued | |
| Spud Date: 2015-01-31 | |
| Final Drill Date: 2015-02-12 | |
| Well Total Depth: 3548.00 m | |
| Surface Hole Latitude: 53.272716 | |
| Surface Hole Longitude: -115.660277 |
| Date | Event |
|---|---|
| 2015-01-23 | Obtained License |
| 2015-02-01 | Surface Casing Operation Performed |
| 2015-02-03 | Direction Drilling Operation Performed - Deviate |
| 2015-02-05 | Direction Drilling Operation Performed - Horizontal |
| 2015-02-06 | Intermediate Casing Operation Performed |
| 2015-02-06 | Well Log Performed |
| 2015-02-12 | Finished Drilling |
| 2015-02-12 | Well Log Performed |
| 2015-02-12 | Well Mode changed to Drilled and Cased |
| 2015-02-14 | Liner Casing Operation Performed |
| 2015-02-14 | Rig Released |
| 2015-05-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-05-19 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-05-21 | Well Began Production |
| 2015-05-21 | Well Fluid changed to Crude Oil |
| 2015-05-21 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-01-31 | Ensign Drilling Inc. | 544 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-02-03 | 1418.50 | Deviate (5 - 79 degrees) |
| 2015-02-05 | 2000.60 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-05-19 | Open Hole/Barefoot Completion | 3547.00 | 3548.00 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2924.30 | 2924.40 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2851.50 | 2851.60 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2779.50 | 2779.60 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2708.60 | 2708.70 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2635.20 | 2635.30 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2564.80 | 2564.90 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2490.80 | 2490.90 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2416.80 | 2416.90 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2344.20 | 2344.30 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2271.60 | 2271.70 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 3506.80 | 3506.90 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2199.90 | 2200.00 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2127.40 | 2127.50 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 3432.50 | 3432.60 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 3360.10 | 3360.20 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 3287.50 | 3287.60 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 3215.00 | 3215.10 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 3142.10 | 3142.20 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 3069.90 | 3070.00 | 0 |
| 2015-05-19 | Multi-Stage Fracture | 2997.40 | 2997.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-05-19 | 2015-05-19 | 1,792 | 2,528 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 84.0005 | N/A | |||
| Sand (20/40) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 4.7113 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 4.7113 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 4.7114 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 4.7113 | N/A | ||||
| Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 7.6726 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 7.6726 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 7.6726 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 7.6726 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0133 | N/A | |
| Water | 7732-18-5 | 100 | 0.0133 | N/A | ||||
| CAN-1912 Clay Stabilizer (HT) | Canyon | Clay Control | No hazardous ingredients | Not Available | 100 | 0.1876 | N/A | |
| CAN-2411 Non-emulsifier | Canyon | Demulsifier | Ethylene glycol | 107-21-1 | 100 | 0.0844 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0844 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0844 | N/A | ||||
| Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 4.2113 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 4.2112 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0607 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-05-19 | 2015-05-19 | Surface Water - Runoff | 1395 |
| 2015-05-19 | 2015-05-19 | Surface Water - Runoff | 1133 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 4775 | 0.0 | 0.0 | 0.0 |
| 2016 | 8454 | 0.0 | 0.0 | 0.0 |
| 2017 | 8652 | 0.0 | 0.0 | 0.0 |
| 2018 | 8722 | 0.0 | 0.0 | 0.0 |
| 2019 | 8511 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-02-14 | No Incident Encountered | 0.00 | 0.00 |
| 2015-05-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]