X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495131315000

Well Details

Well ID: 0495131315000
Loading map...
Location: 00/15-13-049-13W5/0
Location Alias: 00/15-13-49-13 W5M
Location Alias 2: 00/15-13-049-13 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 13
Section: 13
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 15-13-49-13
Operator Name: Ridgeback Resources Inc.
License Number: 0435673
License Date: 2011-08-03
License Status: Issued
Spud Date: 2011-09-16
Final Drill Date: 2011-09-26
Well Total Depth: 3573.00 m
Surface Hole Latitude: 53.218989
Surface Hole Longitude: -115.763270

For data sources see[1][2]

Well History

Date Event
2011-08-03 Obtained License
2011-09-17 Surface Casing Operation Performed
2011-09-18 Well Log Performed
2011-09-19 Direction Drilling Operation Performed - Horizontal
2011-09-20 Well Log Performed
2011-09-26 Finished Drilling
2011-09-26 Well Log Performed
2011-09-26 Well Mode changed to Drilled and Cased
2011-09-28 Perforation Treatment Performed - Open-Hole Completion
2011-09-28 Production Casing Operation Performed
2011-09-28 Rig Released
2011-10-02 Well Log Performed
2011-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-21 Well Began Production
2011-10-21 Well Fluid changed to Crude Oil
2011-10-21 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-19 1529.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-28 Open Hole/Barefoot Completion 3544.00 3573.00 0
2011-10-19 Multi-Stage Fracture 2967.80 2967.90 0
2011-10-19 Multi-Stage Fracture 2907.30 2907.40 0
2011-10-19 Multi-Stage Fracture 2833.80 2833.90 0
2011-10-19 Multi-Stage Fracture 2760.40 2760.50 0
2011-10-19 Multi-Stage Fracture 2700.50 2700.60 0
2011-10-19 Multi-Stage Fracture 2625.80 2625.90 0
2011-10-19 Multi-Stage Fracture 2565.70 2565.80 0
2011-10-20 Multi-Stage Fracture 2494.00 2494.10 0
2011-10-20 Multi-Stage Fracture 2419.50 2419.60 0
2011-10-20 Multi-Stage Fracture 2359.00 2359.10 0
2011-10-19 Multi-Stage Fracture 3518.20 3518.30 0
2011-10-20 Multi-Stage Fracture 2285.40 2285.50 0
2011-10-20 Multi-Stage Fracture 2224.90 2225.00 0
2011-10-19 Multi-Stage Fracture 3449.10 3449.20 0
2011-10-19 Multi-Stage Fracture 3386.30 3386.40 0
2011-10-19 Multi-Stage Fracture 3311.90 3312.00 0
2011-10-19 Multi-Stage Fracture 3251.60 3251.70 0
2011-10-19 Multi-Stage Fracture 3177.10 3177.20 0
2011-10-19 Multi-Stage Fracture 3103.30 3103.40 0
2011-10-19 Multi-Stage Fracture 3042.20 3042.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1330 0.0 0.0 0.0
2012 8444 0.0 0.0 0.0
2013 8226 0.0 0.0 0.0
2014 7862 0.0 0.0 0.0
2015 8174 0.0 0.0 0.0
2016 8716 0.0 0.0 0.0
2017 8076 0.0 0.0 0.0
2018 8395 0.0 0.0 0.0
2019 8599 0.0 0.0 0.0
2020 1989 0.0 0.0 0.0

For data sources see[6]

References