If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495160105002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.196449,"lon":-116.214042,"icon":""}]} |
Location: 00/05-01-049-16W5/2 | |
Location Alias: 00/05-01-49-16 W5M | |
Location Alias 2: 00/05-01-049-16 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 16 | |
Section: 01 | |
County/Municipality: Yellowhead County | |
Well Name: CONOCO EDSON 5-1-49-16 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0126419 | |
License Date: 1987-05-08 | |
License Status: Re-Entered | |
Spud Date: 1987-05-30 | |
Final Drill Date: 1987-06-21 | |
Well Total Depth: 3088.00 m | |
Surface Hole Latitude: 53.196449 | |
Surface Hole Longitude: -116.214042 |
Date | Event |
---|---|
1987-05-08 | Obtained License |
1987-06-01 | Surface Casing Operation Performed |
1987-06-21 | Finished Drilling |
1987-06-21 | Well Log Performed |
1987-06-21 | Well Mode changed to Drilled and Cased |
1987-06-22 | Well Log Performed |
1987-06-23 | Production Casing Operation Performed |
1987-06-24 | Rig Released |
1987-07-02 | Well Log Performed |
1987-08-11 | Well Log Performed |
1987-08-12 | Perforation Treatment Performed - Jet Perforation |
1987-08-23 | Well Log Performed |
1987-10-06 | Well Log Performed |
1987-10-10 | Well Began Production |
1987-10-10 | Well Fluid changed to Gas |
1987-10-10 | Well Mode changed to Flowing |
1987-10-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-10-16 | Plug Back Performed |
1987-10-19 | Perforation Treatment Performed - Jet Perforation |
1987-11-02 | Perforation Treatment Performed - Jet Perforation |
1987-11-03 | Perforation Treatment Performed - Fractured |
1990-07-20 | Well Fluid changed to Gas |
1990-07-20 | Well Mode changed to Suspended |
1990-07-22 | Well Log Performed |
1990-07-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-07-23 | Perforation Treatment Performed - Jet Perforation |
1990-07-23 | Plug Back Performed |
1990-07-23 | Well Fluid changed to Gas |
1990-07-23 | Well Mode changed to Abandoned Zone |
1990-07-24 | Perforation Treatment Performed - Remedial Casing |
1990-07-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-11-30 | Perforation Treatment Performed - Jet Perforation |
1993-11-30 | Perforation Treatment Performed - Remedial Casing |
1993-11-30 | Well Abandoned |
1993-11-30 | Well Fluid changed to Gas |
1993-11-30 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-08-12 | Perforation | 3016.50 | 3019.50 | 13 |
1993-11-30 | Perforation | 200.00 | 201.00 | 20 |
1993-11-30 | Remedial Casing Cementing | 200.00 | 201.00 | 0 |
1987-10-16 | Packing Device Capped w/Cement | 2989.50 | 2994.00 | 0 |
1987-10-19 | Perforation | 2957.00 | 2961.50 | 13 |
1987-11-02 | Perforation | 2957.00 | 2961.50 | 13 |
1987-11-03 | Fracture | 2957.00 | 2961.50 | 0 |
1990-07-23 | Packing Device Capped w/Cement | 2878.00 | 2886.00 | 0 |
1990-07-23 | Perforation | 709.40 | 710.00 | 13 |
1990-07-24 | Remedial Casing Cementing | 709.40 | 710.00 | 0 |
1990-07-28 | Packing Device Capped w/Cement | 550.00 | 558.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 173 | 0.0 | 0.0 | 0.0 |
1989 | 7788 | 0.0 | 0.0 | 0.0 |
1990 | 4638 | 0.0 | 0.0 | 0.0 |
For data sources see[5]