X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504010610A00

Well Details

Well ID: 0504010610A00
Loading map...
Location: A0/10-06-050-01W4/0
Location Alias: A0/10-06-50-01 W4M
Location Alias 2: A0/10-06-050-01 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 06
County/Municipality: County of Vermilion River
Well Name: MURPHY LLOYD 10A-6-50-1
Operator Name: Murphy Oil Company Ltd.
License Number: 0075480
License Date: 1979-05-04
License Status: RecCertified
Spud Date: 1979-05-27
Final Drill Date: 1979-05-29
Well Total Depth: 642.00 m
Surface Hole Latitude: 53.286329
Surface Hole Longitude: -110.134699

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-04 Obtained License
1979-05-29 Finished Drilling
1979-05-29 Well Mode changed to Drilled and Cased
1979-05-30 Production Casing Operation Performed
1979-06-04 Perforation Treatment Performed - Jet Perforation
1979-06-08 Well Began Production
1979-06-08 Well Fluid changed to Crude Oil
1979-06-08 Well Mode changed to Pumping
1979-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-26 Perforation Treatment Performed - Jet Perforation
1983-02-01 Well Fluid changed to Crude Oil
1983-02-01 Well Mode changed to Suspended
1984-06-01 Well Fluid changed to Crude Oil
1984-06-01 Well Mode changed to Pumping
1984-09-01 Well Fluid changed to Crude Oil
1984-09-01 Well Mode changed to Suspended
1990-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-01 Plug Back Performed
1990-11-01 Well Abandoned
1990-11-01 Well Fluid changed to Crude Oil
1990-11-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-04 Perforation 601.50 604.00 14
1979-11-18 Acid Treatment 601.50 604.00 0
1982-05-26 Perforation 606.00 609.00 13
1990-11-01 Packing Device Capped w/Cement 579.00 587.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 2496 0.0 0.0 0.0
1980 2472 0.0 0.0 0.0
1981 72 0.0 0.0 0.0
1982 3912 0.0 0.0 0.0
1984 24 0.0 0.0 0.0

For data sources see[5]

References