X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504010614002

Well Details

Well ID: 0504010614002
Loading map...
Location: 00/14-06-050-01W4/2
Location Alias: 00/14-06-50-01 W4M
Location Alias 2: 00/14-06-050-01 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 06
County/Municipality: County of Vermilion River
Well Name: MURPHY LLOYD 14C-6-50-1
Operator Name: Murphy Oil Company Ltd.
License Number: 0046074
License Date: 1973-06-08
License Status: RecCertified
Spud Date: 1973-06-13
Final Drill Date: 1973-06-14
Well Total Depth: 624.80 m
Surface Hole Latitude: 53.291683
Surface Hole Longitude: -110.143792

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-06-08 Obtained License
1973-06-14 Finished Drilling
1973-06-14 Lost Circulation Occurred
1973-06-14 Well Mode changed to Drilled and Cased
1973-06-15 Production Casing Operation Performed
1973-06-26 Perforation Treatment Performed - Jet Perforation
1973-07-04 Perforation Treatment Performed - Fractured
1975-08-14 Perforation Treatment Performed - Cement Squeeze
1975-09-09 Perforation Treatment Performed - Jet Perforation
1975-10-15 Well Began Production
1975-10-15 Well Fluid changed to Crude Oil
1975-10-15 Well Mode changed to Pumping
1978-03-31 Perforation Treatment Performed - Jet Perforation
1988-10-31 Well Fluid changed to Crude Oil
1988-10-31 Well Mode changed to Suspended
1994-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-09 Plug Back Performed
1994-11-09 Well Abandoned
1994-11-09 Well Fluid changed to Crude Oil
1994-11-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-06-26 Perforation 430.70 432.20 13
1973-07-04 Fracture 430.70 432.20 0
1975-08-14 Cement Squeeze 430.70 432.20 0
1975-09-09 Perforation 601.70 603.80 13
1978-03-31 Perforation 605.90 608.10 13
1994-11-09 Packing Device Capped w/Cement 584.00 592.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 1392 0.0 0.0 0.0
1976 7823 0.0 0.0 0.0
1977 8088 0.0 0.0 0.0
1978 6936 0.0 0.0 0.0
1979 8711 0.0 0.0 0.0
1980 8783 0.0 0.0 0.0
1981 8503 0.0 0.0 0.0
1982 8735 0.0 0.0 0.0
1983 8255 0.0 0.0 0.0
1984 7656 0.0 0.0 0.0
1985 840 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1973-06-14 Lost Circulation 273.10 273.10

For data sources see[6]

References