X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504011112D00

Well Details

Well ID: 0504011112D00
Loading map...
Location: D0/12-11-050-01W4/0
Location Alias: D0/12-11-50-01 W4M
Location Alias 2: D0/12-11-050-01 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 11
County/Municipality: Lloydminster
Well Name: COMMOIL LLOYD #1
Operator Name: Husky Oil Operations Limited
License Number: B0000497
License Date: 1943-09-29
License Status: RecExempt
Spud Date: 1943-10-05
Final Drill Date: 1943-10-31
Well Total Depth: 608.40 m
Surface Hole Latitude: 53.302556
Surface Hole Longitude: -110.049618

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1943-09-29 Obtained License
1943-10-31 Finished Drilling
1943-10-31 Production Casing Operation Performed
1943-11-23 Perforation Treatment Performed - Selective Bullet Perforations
1943-11-24 Perforation Treatment Performed - Selective Bullet Perforations
1943-11-24 Well Mode changed to Drilled and Cased
1946-11-25 Perforation Treatment Performed - Cement Plug
1946-11-28 Perforation Treatment Performed - Bullet Perforation
1946-11-28 Well Began Production
1946-11-28 Well Fluid changed to Gas
1946-11-28 Well Mode changed to Flowing
1948-08-08 Perforation Treatment Performed - Bullet Perforation
1957-07-19 Well Fluid changed to Gas
1957-07-19 Well Mode changed to Suspended
1958-08-29 Perforation Treatment Performed - Cement Plug
1958-08-29 Well Abandoned
1958-08-29 Well Fluid changed to Gas
1958-08-29 Well Mode changed to Abandoned
2013-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-07 Plug Back Performed
2013-03-08 Perforation Treatment Performed - Cement Plug
2013-03-08 Perforation Treatment Performed - Jet Perforation
2013-03-08 Perforation Treatment Performed - Remedial Casing
2013-03-08 Well Log Performed
2013-03-12 Perforation Treatment Performed - Cement Plug
2013-03-12 Perforation Treatment Performed - Jet Perforation
2013-03-12 Perforation Treatment Performed - Remedial Casing
2013-03-12 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1943-11-23 Selective Bullet Perforations 595.90 596.20 33
2013-03-08 Perforation 375.00 376.00 21
2013-03-08 Remedial Casing Cementing 375.00 376.00 0
2013-03-08 Cement Plug 318.00 380.00 0
2013-03-12 Perforation 168.00 169.00 20
2013-03-12 Remedial Casing Cementing 168.00 169.00 0
2013-03-12 Cement Plug 108.80 169.00 0
1943-11-23 Selective Bullet Perforations 597.40 597.70 10
1943-11-24 Selective Bullet Perforations 598.00 598.00 7
1943-11-24 Selective Bullet Perforations 599.20 599.50 13
1946-11-25 Cement Plug 553.80 605.60 0
1946-11-28 Bullet Perforation 524.90 525.50 7
1948-08-08 Bullet Perforation 524.90 525.80 20
1958-08-29 Cement Plug 518.20 522.10 0
2013-03-07 Packing Device Capped w/Cement 506.40 514.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References