If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504013206A02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.357224,"lon":-110.117145,"icon":""}]} |
| Location: A0/06-32-050-01W4/2 | |
| Location Alias: A0/06-32-50-01 W4M | |
| Location Alias 2: A0/06-32-050-01 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 01 | |
| Section: 32 | |
| County/Municipality: County of Vermilion River | |
| Well Name: WLEC LLOYD 6-32-50-1 | |
| Operator Name: West Lake Energy Corp. | |
| License Number: 0186987 | |
| License Date: 1996-03-26 | |
| License Status: Abandoned | |
| Spud Date: 1996-06-16 | |
| Final Drill Date: 1996-06-25 | |
| Well Total Depth: 703.00 m | |
| Surface Hole Latitude: 53.357224 | |
| Surface Hole Longitude: -110.117145 |
| Date | Event |
|---|---|
| 1996-03-26 | Obtained License |
| 1996-06-17 | Surface Casing Operation Performed |
| 1996-06-18 | Direction Drilling Operation Performed - Deviate |
| 1996-06-24 | Direction Drilling Operation Performed - Deviate |
| 1996-06-25 | Finished Drilling |
| 1996-06-25 | Well Log Performed |
| 1996-06-25 | Well Mode changed to Drilled and Cased |
| 1996-06-26 | Production Casing Operation Performed |
| 1996-06-26 | Rig Released |
| 1996-07-20 | Perforation Treatment Performed - Jet Perforation |
| 1996-07-22 | Well Began Production |
| 1996-07-22 | Well Fluid changed to Crude Oil |
| 1996-07-22 | Well Mode changed to Flowing |
| 1998-01-01 | Well Fluid changed to Crude Oil |
| 1998-01-01 | Well Mode changed to Suspended |
| 2004-09-12 | Well Fluid changed to Crude Oil |
| 2004-09-12 | Well Mode changed to Pumping |
| 2011-11-01 | Well Fluid changed to Crude Oil |
| 2011-11-01 | Well Mode changed to Suspended |
| 2016-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-07-26 | Plug Back Performed |
| 2016-07-26 | Well Fluid changed to Crude Oil |
| 2016-07-26 | Well Mode changed to Abandoned Zone |
| 2016-10-07 | Well Abandoned |
| 2016-10-07 | Well Fluid changed to Crude Oil |
| 2016-10-07 | Well Mode changed to Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1996-06-18 | 123.00 | Deviate (5 - 79 degrees) |
| 1996-06-24 | 563.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-07-20 | Perforation | 656.50 | 657.50 | 26 |
| 1996-07-20 | Perforation | 659.00 | 660.00 | 26 |
| 1996-07-20 | Perforation | 660.50 | 662.50 | 26 |
| 2016-07-26 | Packing Device Capped w/Cement | 640.00 | 650.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1996 | 2670 | 0.0 | 0.0 | 0.0 |
| 2004 | 1920 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-07-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]