X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504013209C00

Well Details

Well ID: 0504013209C00
Loading map...
Location: C0/09-32-050-01W4/0
Location Alias: C0/09-32-50-01 W4M
Location Alias 2: C0/09-32-050-01 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 32
County/Municipality: County of Vermilion River
Well Name: DCEL ET AL 9C LLOYD 9-32-50-1
Operator Name: Total E&P Canada Ltd.
License Number: 0170970
License Date: 1994-09-29
License Status: RecExempt
Spud Date: 1995-06-04
Final Drill Date: 1995-06-05
Well Total Depth: 650.00 m
Surface Hole Latitude: 53.358865
Surface Hole Longitude: -110.107912

For data sources see[1][2]

Well History

Date Event
1994-09-29 Obtained License
1995-06-04 Direction Drilling Operation Performed - Deviate
1995-06-04 Surface Casing Operation Performed
1995-06-05 Finished Drilling
1995-06-05 Well Mode changed to Drilled and Cased
1995-06-06 Production Casing Operation Performed
1995-06-06 Well Log Performed
1995-06-07 Rig Released
1995-06-07 Well Log Performed
1995-06-15 Perforation Treatment Performed - Jet Perforation
1995-06-16 Well Began Production
1995-06-16 Well Fluid changed to Crude Oil
1995-06-16 Well Mode changed to Pumping
1997-01-18 Perforation Treatment Performed - Jet Perforation
1997-11-18 Well Log Performed
1999-01-15 Well Fluid changed to Crude Oil
1999-01-15 Well Mode changed to Suspended
2001-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-04-29 Plug Back Performed
2001-04-29 Well Fluid changed to Crude Oil
2001-04-29 Well Mode changed to Abandoned Zone
2001-06-19 Well Abandoned
2001-06-19 Well Fluid changed to Crude Oil
2001-06-19 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-06-04 115.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-15 Perforation 616.70 618.00 26
1995-06-15 Perforation 620.70 621.50 26
1995-06-15 Perforation 623.30 624.50 26
1997-01-18 Perforation 620.50 624.50 13
2001-04-29 Packing Device Capped w/Cement 599.40 607.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3488 0.0 0.0 0.0
1996 3633 0.0 0.0 0.0
1997 1024 0.0 0.0 0.0
1998 2156 0.0 0.0 0.0

For data sources see[6]

References