If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504021509C00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.31722,"lon":-110.205266,"icon":""}]} |
Location: C0/09-15-050-02W4/0 | |
Location Alias: C0/09-15-50-02 W4M | |
Location Alias 2: C0/09-15-050-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 02 | |
Section: 15 | |
County/Municipality: County of Vermilion River | |
Well Name: DALO #5 WELL | |
Operator Name: Dalo Oil Company Limited | |
License Number: B0001654 | |
License Date: 1947-05-23 | |
License Status: RecExempt | |
Spud Date: 1947-05-22 | |
Final Drill Date: 1947-05-25 | |
Well Total Depth: 607.50 m | |
Surface Hole Latitude: 53.317220 | |
Surface Hole Longitude: -110.205266 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1947-05-23 | Obtained License |
1947-05-25 | Finished Drilling |
1947-05-25 | Well Mode changed to Drilled and Cased |
1947-05-29 | Liner Casing Operation Performed |
1947-07-18 | Perforation Treatment Performed - Open-Hole Completion |
1947-07-27 | Perforation Treatment Performed - Selective Bullet Perforations |
1947-08-04 | Well Began Production |
1947-08-04 | Well Fluid changed to Crude Oil |
1947-08-04 | Well Mode changed to Pumping |
1948-07-13 | Perforation Treatment Performed - Slotted Liner or Casing |
1948-11-02 | Perforation Treatment Performed - Cement Squeeze |
1948-11-19 | Perforation Treatment Performed - Bullet Perforation |
1948-11-19 | Perforation Treatment Performed - Selective Bullet Perforations |
1950-04-06 | Perforation Treatment Performed - Selective Bullet Perforations |
1954-10-27 | Well Fluid changed to Crude Oil |
1954-10-27 | Well Mode changed to Suspended |
1956-09-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1956-09-15 | Perforation Treatment Performed - Bullet Perforation |
1956-09-15 | Well Fluid changed to Crude Oil |
1956-09-15 | Well Mode changed to Abandoned |
1956-09-17 | Perforation Treatment Performed - Cement Plug |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1947-07-18 | Open Hole/Barefoot Completion | 602.00 | 604.40 | 0 |
1956-09-15 | Bullet Perforation | 556.30 | 562.40 | 3 |
1956-09-17 | Cement Plug | 545.60 | 579.10 | 0 |
1947-07-27 | Selective Bullet Perforations | 600.50 | 600.50 | 0 |
1948-07-13 | Slotted Liner | 602.00 | 607.50 | 0 |
1948-11-02 | Cement Squeeze | 600.50 | 607.50 | 0 |
1948-11-19 | Selective Bullet Perforations | 605.90 | 605.90 | 0 |
1948-11-19 | Bullet Perforation | 601.10 | 603.50 | 3 |
1948-11-19 | Selective Bullet Perforations | 604.70 | 605.60 | 0 |
1950-04-06 | Selective Bullet Perforations | 603.80 | 604.40 | 0 |
1956-09-13 | Packing Device Capped w/Cement | 579.10 | 579.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]