If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504032014000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.335096,"lon":-110.411068,"icon":""}]} |
| Location: 00/14-20-050-03W4/0 | |
| Location Alias: 00/14-20-50-03 W4M | |
| Location Alias 2: 00/14-20-050-03 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 03 | |
| Section: 20 | |
| County/Municipality: County of Vermilion River | |
| Well Name: PROVIDENT ET AL LLOYD 14-20-50-3 | |
| Operator Name: Pembina NGL Corporation | |
| License Number: 0108113 | |
| License Date: 1984-07-09 | |
| License Status: RecCertified | |
| Spud Date: 1984-07-21 | |
| Final Drill Date: 1984-07-24 | |
| Well Total Depth: 719.00 m | |
| Surface Hole Latitude: 53.335096 | |
| Surface Hole Longitude: -110.411068 |
| Date | Event |
|---|---|
| 1984-07-09 | Obtained License |
| 1984-07-21 | Surface Casing Operation Performed |
| 1984-07-24 | Finished Drilling |
| 1984-07-24 | Well Log Performed |
| 1984-07-24 | Well Mode changed to Drilled and Cased |
| 1984-07-25 | Production Casing Operation Performed |
| 1984-07-25 | Rig Released |
| 1984-08-01 | Perforation Treatment Performed - Jet Perforation |
| 1984-08-02 | Well Began Production |
| 1984-08-02 | Well Fluid changed to Crude Oil |
| 1984-08-02 | Well Mode changed to Pumping |
| 1993-09-12 | Perforation Treatment Performed - Cement Squeeze |
| 1993-09-12 | Plug Back Performed |
| 1993-09-12 | Well Fluid changed to Crude Oil |
| 1993-09-12 | Well Mode changed to Abandoned Zone |
| 1993-09-14 | Well Log Performed |
| 1995-10-21 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1995-10-21 | Perforation Treatment Performed - Cement Plug |
| 1995-10-21 | Perforation Treatment Performed - Remedial Casing |
| 1997-08-22 | Well Abandoned |
| 1997-08-22 | Well Fluid changed to Crude Oil |
| 1997-08-22 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-08-01 | Perforation | 600.00 | 601.00 | 13 |
| 1984-08-01 | Perforation | 596.50 | 598.00 | 13 |
| 1993-09-12 | Cement Squeeze | 596.50 | 601.00 | 0 |
| 1995-10-21 | Hydra Jet Perforation | 337.00 | 337.00 | 0 |
| 1995-10-21 | Remedial Casing Cementing | 337.00 | 337.00 | 0 |
| 1995-10-21 | Cement Plug | 308.00 | 337.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 2980 | 0.0 | 0.0 | 0.0 |
| 1985 | 7512 | 0.0 | 0.0 | 0.0 |
| 1986 | 6310 | 0.0 | 0.0 | 0.0 |
| 1987 | 8759 | 0.0 | 0.0 | 0.0 |
| 1988 | 8663 | 0.0 | 0.0 | 0.0 |
| 1989 | 120 | 0.0 | 0.0 | 0.0 |
| 1990 | 2208 | 0.0 | 0.0 | 0.0 |
| 1991 | 816 | 0.0 | 0.0 | 0.0 |
For data sources see[5]