If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504212906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.341697,"lon":-113.042661,"icon":""}]} |
Location: 00/06-29-050-21W4/0 | |
Location Alias: 00/06-29-50-21 W4M | |
Location Alias 2: 00/06-29-050-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 21 | |
Section: 29 | |
County/Municipality: Leduc County | |
Well Name: PETROREP ET AL JOARCAM 6-29-50-21 | |
Operator Name: Bonavista Energy Corporation | |
License Number: 0079229 | |
License Date: 1979-11-14 | |
License Status: Abandoned | |
Spud Date: 1980-02-04 | |
Final Drill Date: 1980-02-10 | |
Well Total Depth: 1245.00 m | |
Surface Hole Latitude: 53.341697 | |
Surface Hole Longitude: -113.042661 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-11-14 | Obtained License |
1980-02-08 | Drill Stem Test Performed |
1980-02-10 | Finished Drilling |
1980-02-11 | Well Log Performed |
1980-02-12 | Drill Stem Test Performed |
1980-02-14 | Production Casing Operation Performed |
1980-02-14 | Well Mode changed to Drilled and Cased |
1980-03-08 | Perforation Treatment Performed - Jet Perforation |
1980-03-09 | Perforation Treatment Performed - Fractured |
1981-03-06 | Perforation Treatment Performed - Chemical Squeeze |
1981-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-03-12 | Perforation Treatment Performed - Jet Perforation |
1981-03-12 | Well Mode changed to Abandoned Zone |
1981-03-13 | Perforation Treatment Performed - Fractured |
1983-06-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-06-08 | Plug Back Performed |
1983-08-09 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-03-08 | Perforation | 961.00 | 965.00 | 7 |
1980-03-08 | Perforation | 956.00 | 957.00 | 13 |
1980-03-09 | Fracture | 956.00 | 965.00 | 0 |
1981-03-06 | Chemical Squeeze | 956.00 | 965.00 | 0 |
1981-03-12 | Packing Device Capped w/Cement | 930.00 | 930.00 | 0 |
1981-03-12 | Perforation | 408.00 | 412.50 | 7 |
1981-03-13 | Fracture | 408.00 | 412.50 | 0 |
1983-06-08 | Packing Device Capped w/Cement | 384.50 | 393.00 | 0 |
For data sources see[4]