If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504260203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.281505,"lon":-113.698722,"icon":""}]} |
Location: 00/03-02-050-26W4/0 | |
Location Alias: 00/03-02-50-26 W4M | |
Location Alias 2: 00/03-02-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 02 | |
County/Municipality: Leduc County | |
Well Name: MEC LEDUC-WB 3-2-50-26 | |
Operator Name: NEP Canada ULC | |
License Number: 0003204 | |
License Date: 1951-07-18 | |
License Status: Issued | |
Spud Date: 1951-07-26 | |
Final Drill Date: 1951-08-19 | |
Well Total Depth: 1643.20 m | |
Surface Hole Latitude: 53.281505 | |
Surface Hole Longitude: -113.698722 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-07-18 | Obtained License |
1951-08-13 | Drill Stem Test Performed |
1951-08-15 | Production Casing Operation Performed |
1951-08-19 | Finished Drilling |
1951-08-19 | Perforation Treatment Performed - Open-Hole Completion |
1951-08-19 | Well Mode changed to Drilled and Cased |
1951-08-20 | Well Began Production |
1951-08-20 | Well Fluid changed to Crude Oil |
1951-08-20 | Well Mode changed to Flowing |
1954-07-03 | Well Fluid changed to Crude Oil |
1954-07-03 | Well Mode changed to Pumping |
1956-06-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
1963-08-14 | Perforation Treatment Performed - Bullet Perforation |
1986-10-01 | Well Fluid changed to Crude Oil |
1986-10-01 | Well Mode changed to Suspended |
1988-03-23 | Well Log Performed |
1988-03-28 | Well Log Performed |
1988-03-29 | Perforation Treatment Performed - Cement Plug |
1988-03-29 | Perforation Treatment Performed - Open-Hole Completion |
1988-03-29 | Well Log Performed |
1988-04-05 | Well Log Performed |
1988-04-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-04-07 | Perforation Treatment Performed - Jet Perforation |
1999-10-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-18 | Perforation Treatment Performed - Jet Perforation |
1999-10-18 | Plug Back Performed |
1999-10-18 | Well Fluid changed to Crude Oil |
1999-10-18 | Well Mode changed to Abandoned Zone |
2001-01-13 | Perforation Treatment Performed - Fractured |
2012-05-09 | Well Log Performed |
2012-05-10 | Well Log Performed |
2012-05-14 | Perforation Treatment Performed - Cement Squeeze |
2012-05-14 | Plug Back Performed |
2012-05-18 | Perforation Treatment Performed - Jet Perforation |
2012-05-18 | Well Log Performed |
2012-05-22 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-08-19 | Open Hole/Barefoot Completion | 1623.10 | 1643.20 | 0 |
2001-01-13 | Fracture | 1383.00 | 1388.00 | 0 |
2012-05-14 | Cement Squeeze | 1383.00 | 1388.00 | 0 |
2012-05-18 | Perforation | 1550.00 | 1559.00 | 20 |
2012-05-18 | Perforation | 1541.00 | 1543.00 | 20 |
2012-05-22 | Fracture | 1541.00 | 1543.00 | 0 |
2012-05-22 | Fracture | 1550.00 | 1559.00 | 0 |
1956-06-11 | Acid Wash | 1642.30 | 1643.20 | 0 |
1963-08-14 | Bullet Perforation | 1638.90 | 1639.20 | 7 |
1988-03-29 | Cement Plug | 1636.00 | 1643.20 | 0 |
1988-03-29 | Open Hole/Barefoot Completion | 1623.10 | 1636.00 | 0 |
1988-04-07 | Perforation | 1633.70 | 1634.20 | 13 |
1988-04-07 | Acid Treatment | 1623.10 | 1636.00 | 0 |
1999-10-18 | Packing Device Capped w/Cement | 1604.00 | 1612.00 | 0 |
1999-10-18 | Perforation | 1383.00 | 1388.00 | 18 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 24 | 0.0 | 0.0 | 0.0 |
1970 | 1080 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-14 | No Incident Encountered | 0.00 | 0.00 |
2012-05-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]