X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260915000

Well Details

Well ID: 0504260915000
Loading map...
Location: 00/15-09-050-26W4/0
Location Alias: 00/15-09-50-26 W4M
Location Alias 2: 00/15-09-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 09
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC NO.68
Operator Name: Imperial Oil Resources Limited
License Number: B0002102
License Date: 1948-04-29
License Status: Re-Entered
Spud Date: 1948-05-28
Final Drill Date: 1948-06-29
Well Total Depth: 1647.40 m
Surface Hole Latitude: 53.306755
Surface Hole Longitude: -113.741618

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-04-29 Obtained License
1948-06-26 Drill Stem Test Performed
1948-06-29 Finished Drilling
1948-06-29 Well Mode changed to Drilled and Cased
1948-07-01 Production Casing Operation Performed
1948-07-04 Perforation Treatment Performed - Bullet Perforation
1948-07-05 Perforation Treatment Performed - Acid Wash - No Pressure
1948-07-05 Well Began Production
1948-07-05 Well Fluid changed to Crude Oil
1948-07-05 Well Mode changed to Flowing
1972-02-17 Well Fluid changed to Crude Oil
1972-02-17 Well Mode changed to Pumping
1982-06-03 Perforation Treatment Performed - Cement Squeeze
1982-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-08 Perforation Treatment Performed - Jet Perforation
1987-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-16 Perforation Treatment Performed - Cement Squeeze
1987-02-17 Well Log Performed
1987-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-18 Perforation Treatment Performed - Jet Perforation
1989-10-25 Well Fluid changed to Crude Oil
1989-10-25 Well Mode changed to Suspended
1992-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-29 Perforation Treatment Performed - Jet Perforation
1992-06-29 Perforation Treatment Performed - Remedial Casing
1992-06-29 Plug Back Performed
1992-06-29 Well Log Performed
1992-07-21 Perforation Treatment Performed - Cement Plug
1992-07-21 Well Fluid changed to Crude Oil
1992-07-21 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-07-04 Bullet Perforation 1643.80 1645.30 10
1992-06-29 Packing Device Capped w/Cement 1619.00 1627.00 0
1992-06-29 Perforation 201.00 201.50 13
1992-06-29 Remedial Casing Cementing 201.00 201.50 0
1992-07-21 Cement Plug 161.20 201.50 0
1948-07-05 Acid Wash 1643.80 1645.30 0
1982-06-03 Cement Squeeze 1643.80 1645.30 0
1982-06-08 Perforation 1643.50 1643.70 10
1982-06-08 Acid Treatment 1643.50 1643.70 0
1987-02-16 Acid Treatment 1643.50 1643.70 0
1987-02-16 Cement Squeeze 1643.50 1643.70 0
1987-02-18 Perforation 1642.70 1642.80 3
1987-02-18 Acid Treatment 1642.70 1642.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8185 0.0 0.0 0.0
1968 8317 0.0 0.0 0.0
1969 8123 0.0 0.0 0.0
1970 1368 0.0 0.0 0.0
1972 8048 0.0 0.0 0.0
1973 8608 0.0 0.0 0.0
1974 8531 0.0 0.0 0.0
1975 8551 0.0 0.0 0.0
1976 8511 0.0 0.0 0.0
1977 8467 0.0 0.0 0.0
1978 2016 0.0 0.0 0.0
1979 4548 0.0 0.0 0.0
1980 528 0.0 0.0 0.0
1981 744 0.0 0.0 0.0
1982 4512 0.0 0.0 0.0
1983 8605 0.0 0.0 0.0
1984 8458 0.0 0.0 0.0
1985 7622 0.0 0.0 0.0
1986 8351 0.0 0.0 0.0
1987 8173 0.0 0.0 0.0
1988 8686 0.0 0.0 0.0
1989 6706 0.0 0.0 0.0

For data sources see[5]

References