If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504261912000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.33215,"lon":-113.802369,"icon":""}]} |
Location: 00/12-19-050-26W4/0 | |
Location Alias: 00/12-19-50-26 W4M | |
Location Alias 2: 00/12-19-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 19 | |
County/Municipality: Leduc County | |
Well Name: IMPERIAL LEDUC NO. 74 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: B0002366 | |
License Date: 1948-09-23 | |
License Status: RecCertified | |
Spud Date: 1948-09-21 | |
Final Drill Date: 1948-10-23 | |
Well Total Depth: 1626.10 m | |
Surface Hole Latitude: 53.332150 | |
Surface Hole Longitude: -113.802369 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1948-09-23 | Obtained License |
1948-10-19 | Drill Stem Test Performed |
1948-10-20 | Drill Stem Test Performed |
1948-10-21 | Drill Stem Test Performed |
1948-10-22 | Drill Stem Test Performed |
1948-10-23 | Finished Drilling |
1948-10-23 | Well Mode changed to Drilled and Cased |
1948-10-24 | Production Casing Operation Performed |
1948-10-27 | Perforation Treatment Performed - Bullet Perforation |
1948-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1948-11-07 | Perforation Treatment Performed - Cement Squeeze |
1948-11-11 | Drill Stem Test Performed |
1948-11-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1948-11-16 | Perforation Treatment Performed - Cement Squeeze |
1948-11-21 | Perforation Treatment Performed - Bullet Perforation |
1948-11-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1948-11-27 | Perforation Treatment Performed - Cement Squeeze |
1948-11-30 | Perforation Treatment Performed - Open-Hole Completion |
1948-12-02 | Well Began Production |
1948-12-02 | Well Fluid changed to Crude Oil |
1948-12-02 | Well Mode changed to Flowing |
1973-03-26 | Well Fluid changed to Crude Oil |
1973-03-26 | Well Mode changed to Suspended |
1995-05-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-05-08 | Plug Back Performed |
1995-05-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-05-09 | Perforation Treatment Performed - Jet Perforation |
1995-05-09 | Plug Back Performed |
1995-05-09 | Well Log Performed |
1995-05-10 | Well Log Performed |
1995-05-18 | Perforation Treatment Performed - Remedial Casing |
1995-05-18 | Well Fluid changed to Crude Oil |
1995-05-18 | Well Mode changed to Abandoned |
1995-06-01 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1948-10-27 | Bullet Perforation | 1534.70 | 1560.60 | 10 |
1995-05-08 | Packing Device Capped w/Cement | 1512.00 | 1520.00 | 0 |
1995-05-09 | Packing Device Capped w/Cement | 1267.00 | 1275.00 | 0 |
1995-05-09 | Perforation | 160.00 | 161.00 | 13 |
1995-05-18 | Remedial Casing Cementing | 160.00 | 161.00 | 0 |
1948-10-29 | Acid Treatment | 1534.70 | 1560.60 | 0 |
1948-11-07 | Cement Squeeze | 1534.70 | 1560.60 | 0 |
1948-11-11 | Acid Treatment | 1534.70 | 1560.60 | 0 |
1948-11-16 | Cement Squeeze | 1534.70 | 1560.60 | 0 |
1948-11-21 | Bullet Perforation | 1534.70 | 1549.90 | 10 |
1948-11-23 | Acid Treatment | 1534.70 | 1549.90 | 0 |
1948-11-27 | Cement Squeeze | 1534.70 | 1549.90 | 0 |
1948-11-30 | Open Hole/Barefoot Completion | 1625.20 | 1626.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 88 | 0.0 | 0.0 | 0.0 |
For data sources see[5]