X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262007000

Well Details

Well ID: 0504262007000
Loading map...
Location: 00/07-20-050-26W4/0
Location Alias: 00/07-20-50-26 W4M
Location Alias 2: 00/07-20-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 20
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC NO 180
Operator Name: Imperial Oil Resources Limited
License Number: B0002719
License Date: 1949-03-23
License Status: RecCertified
Spud Date: 1949-04-18
Final Drill Date: 1949-05-22
Well Total Depth: 1639.50 m
Surface Hole Latitude: 53.328619
Surface Hole Longitude: -113.766078

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-03-23 Obtained License
1949-05-15 Drill Stem Test Performed
1949-05-18 Liner Casing Operation Performed
1949-05-22 Finished Drilling
1949-05-22 Well Mode changed to Drilled and Cased
1949-05-26 Perforation Treatment Performed - Bullet Perforation
1949-05-27 Well Began Production
1949-05-27 Well Fluid changed to Crude Oil
1949-05-27 Well Mode changed to Flowing
1970-07-07 Perforation Treatment Performed - Jet Perforation
1970-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-24 Well Fluid changed to Crude Oil
1974-10-24 Well Mode changed to Pumping
1980-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-09 Perforation Treatment Performed - Cement Squeeze
1980-07-13 Perforation Treatment Performed - Jet Perforation
1980-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-11 Well Fluid changed to Crude Oil
1990-01-11 Well Mode changed to Suspended
1992-08-07 Well Log Performed
1992-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-08 Perforation Treatment Performed - Jet Perforation
1992-08-08 Plug Back Performed
1992-08-12 Perforation Treatment Performed - Cement Plug
1992-08-12 Perforation Treatment Performed - Remedial Casing
1992-08-12 Well Fluid changed to Crude Oil
1992-08-12 Well Mode changed to Abandoned
1992-08-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-05-26 Bullet Perforation 1635.30 1636.80 20
1992-08-08 Perforation 160.00 160.50 13
1992-08-12 Remedial Casing Cementing 160.00 160.50 0
1992-08-12 Cement Plug 45.20 160.50 0
1970-07-07 Perforation 1630.70 1631.00 7
1970-07-09 Acid Treatment 1630.70 1631.00 0
1980-07-04 Acid Treatment 1630.70 1636.80 0
1980-07-09 Cement Squeeze 1630.70 1636.80 0
1980-07-13 Perforation 1635.10 1635.20 10
1980-07-14 Acid Treatment 1635.10 1635.20 0
1992-08-08 Packing Device Capped w/Cement 1607.00 1615.00 0
1992-08-08 Packing Device Capped w/Cement 1581.00 1589.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1862 0.0 0.0 0.0
1970 3170 0.0 0.0 0.0
1971 6152 0.0 0.0 0.0
1972 8544 0.0 0.0 0.0
1973 8277 0.0 0.0 0.0
1974 7038 0.0 0.0 0.0
1975 8067 0.0 0.0 0.0
1976 7735 0.0 0.0 0.0
1977 2730 0.0 0.0 0.0
1978 8460 0.0 0.0 0.0
1979 8572 0.0 0.0 0.0
1980 7891 0.0 0.0 0.0
1981 8259 0.0 0.0 0.0
1982 8097 0.0 0.0 0.0
1983 8497 0.0 0.0 0.0
1984 8153 0.0 0.0 0.0
1985 6614 0.0 0.0 0.0
1986 6940 0.0 0.0 0.0
1987 8321 0.0 0.0 0.0
1988 8237 0.0 0.0 0.0
1989 7612 0.0 0.0 0.0

For data sources see[5]

References