X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262011000

Well Details

Well ID: 0504262011000
Loading map...
Location: 00/11-20-050-26W4/0
Location Alias: 00/11-20-50-26 W4M
Location Alias 2: 00/11-20-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 20
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 11-20-50-26
Operator Name: NEP Canada ULC
License Number: B0002075
License Date: 1948-03-31
License Status: Issued
Spud Date: 1948-04-06
Final Drill Date: 1948-06-11
Well Total Depth: 1640.00 m
Surface Hole Latitude: 53.332257
Surface Hole Longitude: -113.772058

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-03-31 Obtained License
1948-04-30 Drill Stem Test Performed
1948-05-01 Drill Stem Test Performed
1948-05-02 Drill Stem Test Performed
1948-06-05 Liner Casing Operation Performed
1948-06-11 Finished Drilling
1948-06-11 Well Mode changed to Drilled and Cased
1948-06-15 Perforation Treatment Performed - Acid Wash - No Pressure
1948-06-15 Perforation Treatment Performed - Bullet Perforation
1948-06-16 Well Began Production
1948-06-16 Well Fluid changed to Crude Oil
1948-06-16 Well Mode changed to Flowing
1958-02-11 Perforation Treatment Performed - Cement Squeeze
1958-02-14 Perforation Treatment Performed - Bullet Perforation
1958-02-18 Perforation Treatment Performed - Acid Wash - No Pressure
1989-05-02 Well Fluid changed to Crude Oil
1989-05-02 Well Mode changed to Suspended
1989-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-15 Well Log Performed
1989-05-16 Perforation Treatment Performed - Cement Squeeze
1989-05-21 Perforation Treatment Performed - Open-Hole Completion
1989-05-21 Well Log Performed
1989-05-22 Well Log Performed
1989-05-23 Perforation Treatment Performed - Cement Squeeze
1989-05-23 Well Log Performed
1989-05-24 Perforation Treatment Performed - Jet Perforation
1989-05-24 Well Log Performed
1989-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-01 Well Fluid changed to Gas
1989-11-01 Well Mode changed to Flowing
1990-03-12 Well Log Performed
1990-09-25 Well Log Performed
1990-10-19 Well Log Performed
1990-10-26 Perforation Treatment Performed - Cement Squeeze
1990-10-29 Perforation Treatment Performed - Jet Perforation
1990-10-29 Well Log Performed
1990-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-01 Well Log Performed
1992-01-14 Well Log Performed
1997-10-06 Well Log Performed
1998-11-30 Well Fluid changed to Gas
1998-11-30 Well Mode changed to Suspended
1999-08-04 Well Fluid changed to Crude Oil
1999-08-04 Well Mode changed to Flowing
2001-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-01-01 Well Fluid changed to Crude Oil
2007-01-01 Well Mode changed to Pumping
2014-02-01 Well Fluid changed to Crude Oil
2014-02-01 Well Mode changed to Suspended
2019-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-12 Plug Back Performed
2019-07-12 Well Log Performed
2019-07-13 Perforation Treatment Performed - Jet Perforation
2019-07-13 Well Log Performed
2019-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-07-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-06-15 Bullet Perforation 1627.00 1631.00 10
1989-05-24 Perforation 1613.50 1620.00 13
1989-05-25 Acid Treatment 1613.50 1620.00 0
1990-10-26 Cement Squeeze 1613.50 1620.00 0
1990-10-29 Perforation 1613.50 1616.50 13
1990-10-30 Acid Treatment 1613.50 1616.50 0
1990-11-01 Acid Treatment 1613.50 1616.50 0
2001-04-30 Acid Treatment 1613.50 1616.50 0
2019-07-12 Packing Device Capped w/Cement 1596.00 1604.00 0
2019-07-13 Perforation 1551.00 1575.00 20
2019-07-14 Acid Treatment 1551.00 1575.00 0
1948-06-15 Acid Wash 1627.00 1631.00 0
1958-02-11 Cement Squeeze 1627.00 1631.00 0
1958-02-14 Bullet Perforation 1629.50 1630.10 13
1958-02-18 Acid Wash 1629.50 1630.10 0
1989-05-14 Acid Treatment 1629.50 1630.10 0
1989-05-16 Cement Squeeze 1629.50 1630.10 0
1989-05-21 Open Hole/Barefoot Completion 1633.10 1640.00 0
1989-05-23 Cement Squeeze 1633.10 1640.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1971 1236 0.0 0.0 0.0
1972 7608 0.0 0.0 0.0
1973 8477 0.0 0.0 0.0
1974 8585 0.0 0.0 0.0
1975 8541 0.0 0.0 0.0
1976 8412 0.0 0.0 0.0
1977 8433 0.0 0.0 0.0
1978 8412 0.0 0.0 0.0
1979 8596 0.0 0.0 0.0
1980 8467 0.0 0.0 0.0
1981 8153 0.0 0.0 0.0
1982 8435 0.0 0.0 0.0
1983 7996 0.0 0.0 0.0
1984 8356 0.0 0.0 0.0
1985 6002 0.0 0.0 0.0
1986 5917 0.0 0.0 0.0
1987 7062 0.0 0.0 0.0
1988 8603 0.0 0.0 0.0
1989 4243 0.0 0.0 0.0
1990 7013 0.0 0.0 0.0
1991 5340 0.0 0.0 0.0
1992 8702 0.0 0.0 0.0
1993 4420 0.0 0.0 0.0
1994 2780 0.0 0.0 0.0
1995 48 0.0 0.0 0.0
1996 1848 0.0 0.0 0.0
1999 3648 0.0 0.0 0.0
2000 8561 0.0 0.0 0.0
2001 7026 0.0 0.0 0.0
2002 7959 0.0 0.0 0.0
2003 8681 0.0 0.0 0.0
2004 8583 0.0 0.0 0.0
2005 8610 0.0 0.0 0.0
2006 8178 0.0 0.0 0.0
2007 8600 0.0 0.0 0.0
2008 5533 0.0 0.0 0.0
2009 8388 0.0 0.0 0.0
2010 8261 0.0 0.0 0.0
2011 8575 0.0 0.0 0.0
2012 8432 0.0 0.0 0.0
2013 734 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References