X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262202000

Well Details

Well ID: 0504262202000
Loading map...
Location: 00/02-22-050-26W4/0
Location Alias: 00/02-22-50-26 W4M
Location Alias 2: 00/02-22-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 22
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 2-22-50-26
Operator Name: NEP Canada ULC
License Number: B0002523
License Date: 1948-12-06
License Status: Issued
Spud Date: 1949-02-20
Final Drill Date: 1949-04-07
Well Total Depth: 1645.00 m
Surface Hole Latitude: 53.325025
Surface Hole Longitude: -113.717196

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-12-06 Obtained License
1949-03-28 Drill Stem Test Performed
1949-04-07 Finished Drilling
1949-04-07 Well Mode changed to Drilled and Cased
1949-04-08 Liner Casing Operation Performed
1949-04-15 Perforation Treatment Performed - Bullet Perforation
1949-04-15 Well Began Production
1949-04-15 Well Fluid changed to Crude Oil
1949-04-15 Well Mode changed to Flowing
1972-10-05 Well Fluid changed to Crude Oil
1972-10-05 Well Mode changed to Pumping
1986-10-01 Well Fluid changed to Crude Oil
1986-10-01 Well Mode changed to Suspended
1987-07-30 Well Log Performed
1987-07-31 Perforation Treatment Performed - Cement Squeeze
1987-08-05 Perforation Treatment Performed - Jet Perforation
1987-08-05 Well Log Performed
1987-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-07 Perforation Treatment Performed - Jet Perforation
1987-08-07 Well Log Performed
1987-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-12 Perforation Treatment Performed - Cement Squeeze
1987-08-23 Well Fluid changed to Crude Oil
1987-08-23 Well Mode changed to Pumping
1989-08-03 Well Fluid changed to Crude Oil
1989-08-03 Well Mode changed to Suspended
1989-08-30 Well Log Performed
1989-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-03 Well Log Performed
1989-09-04 Perforation Treatment Performed - Cement Squeeze
1989-09-05 Perforation Treatment Performed - Open-Hole Completion
1989-09-06 Well Log Performed
1989-09-07 Perforation Treatment Performed - Cement Squeeze
1989-09-07 Perforation Treatment Performed - Jet Perforation
1989-09-07 Well Log Performed
1989-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-10 Well Fluid changed to Gas
1989-11-10 Well Mode changed to Flowing
1990-10-23 Well Log Performed
1991-02-21 Well Log Performed
1991-08-14 Well Log Performed
1991-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-11-24 Perforation Treatment Performed - Jet Perforation
1992-03-03 Well Fluid changed to Gas
1992-03-03 Well Mode changed to Suspended
1997-01-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-01 Perforation Treatment Performed - Jet Perforation
1997-09-26 Well Log Performed
1997-09-30 Well Log Performed
1997-10-02 Perforation Treatment Performed - Cement Squeeze
1997-10-02 Well Log Performed
1997-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-03 Perforation Treatment Performed - Jet Perforation
1997-10-04 Well Fluid changed to Gas
1997-10-04 Well Mode changed to Flowing
1997-12-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-30 Plug Back Performed
1998-01-01 Well Fluid changed to Gas
1998-01-01 Well Mode changed to Suspended
1998-01-06 Perforation Treatment Performed - Jet Perforation
1998-01-06 Well Log Performed
2005-04-05 Perforation Treatment Performed - Cement Squeeze
2005-04-05 Plug Back Performed
2005-04-08 Perforation Treatment Performed - Jet Perforation
2005-05-13 Well Fluid changed to Gas
2005-05-13 Well Mode changed to Flowing
2005-09-27 Perforation Treatment Performed - Jet Perforation
2005-09-27 Well Log Performed
2006-11-01 Well Fluid changed to Gas
2006-11-01 Well Mode changed to Pumping
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended
2012-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-17 Plug Back Performed
2012-05-17 Well Fluid changed to Gas
2012-05-17 Well Log Performed
2012-05-17 Well Mode changed to Abandoned Zone
2012-05-18 Well Log Performed
2012-05-23 Well Log Performed
2012-06-11 Perforation Treatment Performed - Jet Perforation
2012-06-11 Well Log Performed
2012-06-14 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-04-15 Bullet Perforation 1631.30 1632.80 30
1989-09-04 Cement Squeeze 1628.80 1628.90 0
1989-09-05 Open Hole/Barefoot Completion 1634.60 1645.00 0
1989-09-07 Cement Squeeze 1634.60 1645.00 0
1989-09-07 Perforation 1610.50 1613.50 13
1989-09-08 Acid Treatment 1610.50 1613.50 0
1991-11-24 Perforation 1625.00 1625.50 13
1991-11-24 Acid Treatment 1610.50 1625.50 0
1997-01-01 Perforation 1608.20 1608.70 18
1997-01-01 Acid Treatment 1608.20 1608.70 0
1997-10-02 Cement Squeeze 1608.20 1608.70 0
1987-07-31 Cement Squeeze 1631.30 1632.80 0
1997-10-03 Perforation 1604.00 1605.00 14
1997-10-03 Acid Treatment 1604.00 1605.00 0
1997-12-30 Packing Device Capped w/Cement 1590.00 1598.00 0
1998-01-06 Perforation 1087.00 1089.00 18
2005-04-05 Cement Squeeze 1087.00 1089.00 0
2005-04-08 Perforation 1604.00 1606.00 17
2005-09-27 Perforation 1604.00 1607.00 17
2012-05-17 Packing Device Capped w/Cement 1589.00 1597.00 0
2012-06-11 Perforation 1516.00 1538.00 20
2012-06-14 Fracture 1516.00 1538.00 0
1987-08-05 Perforation 1628.80 1628.90 13
1987-08-06 Acid Treatment 1628.80 1628.90 0
1987-08-07 Perforation 1623.30 1623.40 13
1987-08-10 Acid Treatment 1623.30 1623.40 0
1987-08-12 Cement Squeeze 1623.30 1623.40 0
1989-08-31 Acid Treatment 1628.80 1628.90 0
1989-09-03 Acid Treatment 1628.80 1628.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 72 0.0 0.0 0.0
1972 2184 0.0 0.0 0.0
1973 8491 0.0 0.0 0.0
1974 8344 0.0 0.0 0.0
1975 8415 0.0 0.0 0.0
1976 8531 0.0 0.0 0.0
1977 8095 0.0 0.0 0.0
1978 8159 0.0 0.0 0.0
1979 8111 0.0 0.0 0.0
1980 8377 0.0 0.0 0.0
1981 7380 0.0 0.0 0.0
1982 8483 0.0 0.0 0.0
1983 8455 0.0 0.0 0.0
1984 8514 0.0 0.0 0.0
1985 8423 0.0 0.0 0.0
1986 144 0.0 0.0 0.0
1987 3138 0.0 0.0 0.0
1988 8663 0.0 0.0 0.0
1989 6939 0.0 0.0 0.0
1990 8536 0.0 0.0 0.0
1991 6709 0.0 0.0 0.0
1997 1961 0.0 0.0 0.0
2005 4303 0.0 0.0 0.0
2006 6916 0.0 0.0 0.0
2007 7895 0.0 0.0 0.0
2008 7430 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-17 No Incident Encountered 0.00 0.00
2012-06-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References