X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262203000

Well Details

Well ID: 0504262203000
Loading map...
Location: 00/03-22-050-26W4/0
Location Alias: 00/03-22-50-26 W4M
Location Alias 2: 00/03-22-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 22
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 3-22-50-26
Operator Name: NEP Canada ULC
License Number: B0002347
License Date: 1948-09-15
License Status: Issued
Spud Date: 1948-09-21
Final Drill Date: 1948-10-15
Well Total Depth: 1636.20 m
Surface Hole Latitude: 53.325025
Surface Hole Longitude: -113.723281

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-09-15 Obtained License
1948-10-15 Finished Drilling
1948-10-15 Well Mode changed to Drilled and Cased
1948-10-16 Liner Casing Operation Performed
1948-10-20 Perforation Treatment Performed - Bullet Perforation
1948-10-22 Well Began Production
1948-10-22 Well Fluid changed to Crude Oil
1948-10-22 Well Mode changed to Flowing
1973-05-29 Perforation Treatment Performed - Acid Wash - No Pressure
1973-07-11 Perforation Treatment Performed - Cement Squeeze
1973-07-13 Perforation Treatment Performed - Jet Perforation
1973-07-16 Perforation Treatment Performed - Acid Wash - No Pressure
1982-12-01 Well Fluid changed to Crude Oil
1982-12-01 Well Mode changed to Pumping
1988-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-15 Perforation Treatment Performed - Cement Squeeze
1988-03-15 Perforation Treatment Performed - Jet Perforation
1988-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-11 Perforation Treatment Performed - Cement Squeeze
1988-07-11 Well Log Performed
1988-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-13 Perforation Treatment Performed - Jet Perforation
1988-07-18 Perforation Treatment Performed - Cement Squeeze
1988-07-20 Perforation Treatment Performed - Jet Perforation
1988-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-10 Well Fluid changed to Crude Oil
1990-08-10 Well Mode changed to Suspended
1998-04-28 Perforation Treatment Performed - Jet Perforation
1998-04-28 Perforation Treatment Performed - Remedial Casing
1998-05-03 Well Log Performed
1998-05-04 Perforation Treatment Performed - Jet Perforation
1998-05-05 Perforation Treatment Performed - Fractured
1998-05-09 Well Fluid changed to Crude Oil
1998-05-09 Well Mode changed to Suspended
1998-09-27 Well Log Performed
1998-09-28 Well Log Performed
1998-09-29 Well Log Performed
1998-10-01 Well Log Performed
1998-10-05 Well Log Performed
2005-04-21 Perforation Treatment Performed - Cement Squeeze
2005-04-21 Plug Back Performed
2005-05-04 Perforation Treatment Performed - Jet Perforation
2005-05-04 Well Log Performed
2005-08-20 Well Fluid changed to Crude Oil
2005-08-20 Well Mode changed to Pumping
2013-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-10-20 Bullet Perforation 1632.50 1634.00 20
1988-03-15 Perforation 1630.40 1630.55 13
1988-07-08 Acid Treatment 1630.40 1630.55 0
1988-07-11 Cement Squeeze 1630.40 1630.55 0
1988-07-13 Perforation 1631.20 1631.35 3
1988-07-13 Acid Treatment 1631.20 1631.35 0
1988-07-18 Cement Squeeze 1631.20 1631.35 0
1988-07-20 Perforation 1630.40 1630.55 3
1988-07-21 Acid Treatment 1630.40 1630.55 0
1998-04-28 Perforation 160.00 161.00 13
1998-04-28 Remedial Casing Cementing 160.00 161.00 0
1973-05-29 Acid Wash 1632.50 1634.00 0
1998-05-04 Perforation 1182.50 1189.50 13
1998-05-05 Fracture 1182.50 1189.50 0
2005-04-21 Cement Squeeze 1182.50 1189.50 0
2005-05-04 Perforation 1612.00 1614.00 17
2013-02-08 Acid Treatment 1612.00 1614.00 0
1973-07-11 Cement Squeeze 1632.50 1634.00 0
1973-07-13 Perforation 1632.80 1633.40 7
1973-07-16 Acid Wash 1632.80 1633.40 0
1988-03-15 Cement Squeeze 1632.80 1633.40 0
1988-03-15 Perforation 1631.20 1631.35 13
1988-03-15 Acid Treatment 1631.20 1631.35 0
1988-03-15 Cement Squeeze 1631.20 1631.35 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1971 192 0.0 0.0 0.0
1972 48 0.0 0.0 0.0
1973 360 0.0 0.0 0.0
1975 3386 0.0 0.0 0.0
1976 3815 0.0 0.0 0.0
1977 2681 0.0 0.0 0.0
1978 7751 0.0 0.0 0.0
1979 8392 0.0 0.0 0.0
1980 8389 0.0 0.0 0.0
1981 8538 0.0 0.0 0.0
1982 8340 0.0 0.0 0.0
1983 8028 0.0 0.0 0.0
1984 7653 0.0 0.0 0.0
1985 6934 0.0 0.0 0.0
1986 8205 0.0 0.0 0.0
1987 7496 0.0 0.0 0.0
1988 7714 0.0 0.0 0.0
1989 8196 0.0 0.0 0.0
1990 5202 0.0 0.0 0.0
2005 3208 0.0 0.0 0.0
2006 7664 0.0 0.0 0.0
2007 8260 0.0 0.0 0.0
2008 8448 0.0 0.0 0.0
2009 840 0.0 0.0 0.0
2010 7305 0.0 0.0 0.0
2011 8156 0.0 0.0 0.0
2012 8041 0.0 0.0 0.0
2013 8596 0.0 0.0 0.0
2014 8373 0.0 0.0 0.0
2015 8453 0.0 0.0 0.0
2016 8770 0.0 0.0 0.0
2017 8219 0.0 0.0 0.0
2018 7698 0.0 0.0 0.0
2019 8689 0.0 0.0 0.0
2020 2047 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References