X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262205020

Well Details

Well ID: 0504262205020
Loading map...
Location: 02/05-22-050-26W4/0
Location Alias: 02/05-22-50-26 W4M
Location Alias 2: 02/05-22-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 22
County/Municipality: Leduc County
Well Name: IMP 171 LEDUC 5-22L-50-26
Operator Name: Imperial Oil Resources Limited
License Number: B0002647
License Date: 1949-02-19
License Status: Suspension
Spud Date: 1949-02-17
Final Drill Date: 1949-03-23
Well Total Depth: 1637.10 m
Surface Hole Latitude: 53.328851
Surface Hole Longitude: -113.728814

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-02-19 Obtained License
1949-03-01 Perforation Treatment Performed - Bullet Perforation
1949-03-06 Drill Stem Test Performed
1949-03-07 Drill Stem Test Performed
1949-03-23 Finished Drilling
1949-03-23 Well Mode changed to Drilled and Cased
1949-03-25 Liner Casing Operation Performed
1949-03-28 Perforation Treatment Performed - Acid Wash - No Pressure
1949-03-29 Well Began Production
1949-03-29 Well Fluid changed to Crude Oil
1949-03-29 Well Mode changed to Flowing
1953-10-11 Perforation Treatment Performed - Jet Perforation
1960-09-03 Perforation Treatment Performed - Jet Perforation
1960-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-15 Well Fluid changed to Crude Oil
1960-09-15 Well Mode changed to Flowing
1961-12-28 Well Fluid changed to Crude Oil
1961-12-28 Well Mode changed to Suspended
1962-03-14 Perforation Treatment Performed - Cement Squeeze
1962-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-13 Perforation Treatment Performed - Jet Perforation
1962-06-18 Perforation Treatment Performed - Cement Squeeze
1962-06-23 Well Fluid changed to Crude Oil
1962-06-23 Well Mode changed to Flowing
1981-05-26 Well Fluid changed to Crude Oil
1981-05-26 Well Mode changed to Pumping
1990-01-09 Well Fluid changed to Crude Oil
1990-01-09 Well Mode changed to Suspended
1990-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-15 Well Log Performed
1990-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-16 Perforation Treatment Performed - Jet Perforation
1990-05-16 Well Log Performed
1990-05-29 Well Fluid changed to Crude Oil
1990-05-29 Well Mode changed to Flowing
1991-02-05 Well Fluid changed to Crude Oil
1991-02-05 Well Mode changed to Suspended
1996-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-03 Perforation Treatment Performed - Jet Perforation
1996-10-03 Plug Back Performed
1998-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-08 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-03-01 Bullet Perforation 1633.40 1634.90 23
1962-06-13 Perforation 1354.80 1359.40 7
1962-06-13 Acid Treatment 1344.80 1359.40 0
1962-06-18 Cement Squeeze 1344.80 1361.20 0
1990-05-15 Packing Device Capped w/Cement 1628.50 1631.50 0
1990-05-16 Perforation 1626.00 1626.30 13
1990-05-16 Acid Treatment 1626.00 1626.30 0
1996-10-03 Packing Device Capped w/Cement 1602.00 1610.00 0
1996-10-03 Packing Device Capped w/Cement 1243.00 1251.00 0
1996-10-03 Perforation 160.00 161.00 13
1998-05-07 Packing Device Capped w/Cement 582.00 590.00 0
1949-03-28 Acid Wash 1633.40 1634.90 0
1998-05-08 Remedial Casing Cementing 160.00 161.00 0
1953-10-11 Perforation 1633.40 1634.90 13
1960-09-03 Perforation 1344.80 1353.30 7
1960-09-03 Perforation 1359.40 1365.50 7
1960-09-07 Acid Treatment 1344.80 1365.50 0
1962-03-14 Cement Squeeze 1359.40 1365.50 0
1962-03-16 Acid Treatment 1344.80 1353.30 0
1962-05-08 Acid Treatment 1344.80 1353.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1967 116 0.0 0.0 0.0
1972 144 0.0 0.0 0.0
1974 2464 0.0 0.0 0.0
1975 7574 0.0 0.0 0.0
1976 8424 0.0 0.0 0.0
1977 8499 0.0 0.0 0.0
1978 8513 0.0 0.0 0.0
1979 8483 0.0 0.0 0.0
1980 8451 0.0 0.0 0.0
1981 7571 0.0 0.0 0.0
1982 8591 0.0 0.0 0.0
1983 8043 0.0 0.0 0.0
1984 8593 0.0 0.0 0.0
1985 7921 0.0 0.0 0.0
1986 8417 0.0 0.0 0.0
1987 8526 0.0 0.0 0.0
1988 8682 0.0 0.0 0.0
1989 7080 0.0 0.0 0.0
1990 5209 0.0 0.0 0.0
1991 768 0.0 0.0 0.0

For data sources see[5]

References