If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504263102030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.353611,"lon":-113.790545,"icon":""}]} |
Location: 03/02-31-050-26W4/0 | |
Location Alias: 03/02-31-50-26 W4M | |
Location Alias 2: 03/02-31-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 31 | |
County/Municipality: Leduc County | |
Well Name: IMPERIAL LEDUC NO. 494 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0004186 | |
License Date: 1952-02-07 | |
License Status: RecCertified | |
Spud Date: 1952-02-01 | |
Final Drill Date: 1952-02-14 | |
Well Total Depth: 1360.90 m | |
Surface Hole Latitude: 53.353611 | |
Surface Hole Longitude: -113.790545 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-02-07 | Obtained License |
1952-02-14 | Finished Drilling |
1952-02-14 | Well Mode changed to Drilled and Cased |
1952-02-15 | Drill Stem Test Performed |
1952-02-18 | Drill Stem Test Performed |
1952-02-18 | Production Casing Operation Performed |
1952-02-20 | Perforation Treatment Performed - Bullet Perforation |
1952-05-10 | Well Began Production |
1952-05-10 | Well Fluid changed to Crude Oil |
1952-05-10 | Well Mode changed to Pumping |
1952-08-20 | Perforation Treatment Performed - Jet Perforation |
1953-02-03 | Perforation Treatment Performed - Jet Perforation |
1953-02-10 | Perforation Treatment Performed - Cement Squeeze |
1961-05-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1961-05-02 | Plug Back Performed |
1961-05-02 | Well Fluid changed to Crude Oil |
1961-05-02 | Well Mode changed to Abandoned Zone |
1975-11-12 | Perforation Treatment Performed - Cement Plug |
1975-11-14 | Perforation Treatment Performed - Cement Plug |
1975-11-17 | Perforation Treatment Performed - Cement Plug |
1975-11-17 | Well Abandoned |
1975-11-17 | Well Fluid changed to Crude Oil |
1975-11-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-02-20 | Bullet Perforation | 1353.90 | 1354.80 | 20 |
1952-08-20 | Perforation | 1353.90 | 1354.80 | 13 |
1953-02-03 | Perforation | 1352.10 | 1352.70 | 13 |
1953-02-10 | Cement Squeeze | 1352.10 | 1352.70 | 0 |
1961-05-02 | Packing Device Capped w/Cement | 1343.80 | 1351.80 | 0 |
1975-11-12 | Cement Plug | 820.20 | 856.50 | 0 |
1975-11-14 | Cement Plug | 290.20 | 349.60 | 0 |
1975-11-17 | Cement Plug | 32.90 | 182.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]