X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263205020

Well Details

Well ID: 0504263205020
Loading map...
Location: 02/05-32-050-26W4/0
Location Alias: 02/05-32-50-26 W4M
Location Alias 2: 02/05-32-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 32
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC NO. 489
Operator Name: Imperial Oil Limited
License Number: 0004981
License Date: 1952-07-11
License Status: RecCertified
Spud Date: 1952-08-10
Final Drill Date: 1952-08-29
Well Total Depth: 1499.60 m
Surface Hole Latitude: 53.357879
Surface Hole Longitude: -113.777559

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-11 Obtained License
1952-08-21 Drill Stem Test Performed
1952-08-29 Finished Drilling
1952-08-29 Well Mode changed to Drilled and Cased
1952-08-30 Perforation Treatment Performed - Open-Hole Completion
1952-08-30 Production Casing Operation Performed
1952-10-20 Well Began Production
1952-10-20 Well Fluid changed to Crude Oil
1952-10-20 Well Mode changed to Flowing
1958-12-18 Well Fluid changed to Crude Oil
1958-12-18 Well Mode changed to Pumping
1963-12-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-05 Perforation Treatment Performed - Cement Squeeze
1964-03-06 Perforation Treatment Performed - Open-Hole Completion
1964-03-07 Perforation Treatment Performed - Jet Perforation
1964-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-14 Well Fluid changed to Crude Oil
1973-02-14 Well Mode changed to Suspended
1974-11-15 Perforation Treatment Performed - Cement Plug
1974-11-22 Well Abandoned
1974-11-22 Well Fluid changed to Crude Oil
1974-11-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-30 Open Hole/Barefoot Completion 1478.30 1499.60 0
1963-12-30 Acid Treatment 1492.90 1495.30 0
1964-03-05 Cement Squeeze 1488.90 1495.70 0
1964-03-06 Open Hole/Barefoot Completion 1478.30 1488.90 0
1964-03-07 Perforation 1487.40 1488.60 7
1964-03-09 Acid Treatment 1487.40 1488.60 0
1974-11-15 Cement Plug 1427.10 1499.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 108 0.0 0.0 0.0
1969 2136 0.0 0.0 0.0
1970 144 0.0 0.0 0.0

For data sources see[5]

References