X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263206030

Well Details

Well ID: 0504263206030
Loading map...
Location: 03/06-32-050-26W4/0
Location Alias: 03/06-32-50-26 W4M
Location Alias 2: 03/06-32-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 32
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 6-32-50-26
Operator Name: NEP Canada ULC
License Number: 0009355
License Date: 1955-03-28
License Status: Abandoned
Spud Date: 1955-04-14
Final Drill Date: 1955-06-10
Well Total Depth: 1871.50 m
Surface Hole Latitude: 53.358879
Surface Hole Longitude: -113.775033

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-03-28 Obtained License
1955-05-19 Liner Casing Operation Performed
1955-06-10 Finished Drilling
1955-06-10 Perforation Treatment Performed - Open-Hole Completion
1955-06-10 Well Mode changed to Drilled and Cased
1955-06-12 Perforation Treatment Performed - Acid Wash - No Pressure
1955-06-13 Perforation Treatment Performed - Acid Wash - No Pressure
1955-08-22 Well Began Injection
1955-08-22 Well Fluid changed to Water
1955-08-22 Well Type changed to Injection
1957-03-03 Perforation Treatment Performed - Acid Wash - No Pressure
1957-03-04 Perforation Treatment Performed - Acid Wash - No Pressure
1957-03-09 Perforation Treatment Performed - Open-Hole Completion
1958-05-01 Perforation Treatment Performed - Open-Hole Completion
1984-06-01 Well Fluid changed to Water
1984-06-01 Well Mode changed to Suspended
1984-06-01 Well Type changed to Injection
2002-03-01 Well Fluid changed to Water
2002-03-01 Well Type changed to Disposal
2007-12-01 Well Fluid changed to Water
2007-12-01 Well Mode changed to Suspended
2007-12-01 Well Type changed to Disposal
2014-09-06 Well Log Performed
2014-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-09 Perforation Treatment Performed - Jet Perforation
2014-09-09 Plug Back Performed
2014-09-09 Well Log Performed
2014-09-10 Perforation Treatment Performed - Cement Squeeze
2014-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-11 Perforation Treatment Performed - Jet Perforation
2014-09-11 Plug Back Performed
2014-09-11 Well Fluid changed to Water
2014-09-11 Well Log Performed
2014-09-11 Well Mode changed to Abandoned Zone
2014-09-11 Well Type changed to Disposal
2014-09-12 Perforation Treatment Performed - Cement Plug
2014-09-12 Perforation Treatment Performed - Cement Squeeze
2014-09-12 Plug Back Performed
2014-09-14 Perforation Treatment Performed - Jet Perforation
2014-09-15 Perforation Treatment Performed - Cement Plug
2014-09-15 Perforation Treatment Performed - Cement Squeeze
2014-09-15 Plug Back Performed
2014-09-16 Well Log Performed
2014-09-17 Perforation Treatment Performed - Jet Perforation
2014-09-17 Well Log Performed
2014-09-18 Perforation Treatment Performed - Cement Plug
2014-09-18 Perforation Treatment Performed - Cement Squeeze
2014-09-18 Plug Back Performed
2014-09-21 Perforation Treatment Performed - Jet Perforation
2014-09-21 Well Log Performed
2014-09-22 Perforation Treatment Performed - Cement Plug
2014-09-22 Perforation Treatment Performed - Cement Squeeze
2014-09-22 Plug Back Performed
2014-09-23 Perforation Treatment Performed - Jet Perforation
2014-09-23 Well Log Performed
2014-11-01 Well Log Performed
2014-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-07 Perforation Treatment Performed - Cement Squeeze
2014-11-07 Perforation Treatment Performed - Jet Perforation
2014-11-07 Plug Back Performed
2014-11-07 Well Log Performed
2014-11-12 Well Log Performed
2014-11-27 Perforation Treatment Performed - Jet Perforation
2014-11-27 Well Log Performed
2014-11-28 Perforation Treatment Performed - Cement Plug
2014-11-28 Perforation Treatment Performed - Cement Squeeze
2014-11-28 Plug Back Performed
2014-11-30 Well Log Performed
2014-12-02 Perforation Treatment Performed - Jet Perforation
2014-12-02 Well Log Performed
2014-12-03 Perforation Treatment Performed - Cement Plug
2014-12-03 Perforation Treatment Performed - Cement Squeeze
2014-12-03 Plug Back Performed
2015-06-16 Well Log Performed
2015-06-26 Perforation Treatment Performed - Jet Perforation
2015-06-26 Well Log Performed
2015-06-30 Perforation Treatment Performed - Cement Plug
2015-07-02 Perforation Treatment Performed - Jet Perforation
2015-07-02 Well Log Performed
2015-07-03 Perforation Treatment Performed - Cement Squeeze
2016-08-13 Well Abandoned
2016-08-13 Well Fluid changed to Water
2016-08-13 Well Mode changed to Abandoned
2016-08-13 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-06-10 Open Hole/Barefoot Completion 1627.00 1871.50 0
2014-09-10 Cement Squeeze 1525.00 1526.00 0
2014-09-11 Packing Device Capped w/Cement 1506.00 1514.40 0
2014-09-11 Perforation 1440.00 1441.00 20
2014-09-12 Cement Squeeze 1440.00 1441.00 0
2014-09-12 Cement Plug 1396.00 1463.00 0
2014-09-14 Perforation 840.00 841.00 17
2014-09-15 Cement Squeeze 840.00 841.00 0
2014-09-15 Cement Plug 792.00 862.00 0
2014-09-17 Perforation 625.00 626.00 17
2014-09-18 Cement Squeeze 625.00 626.00 0
1955-06-12 Acid Wash 1627.00 1871.50 0
2014-09-18 Cement Plug 600.00 647.00 0
2014-09-21 Perforation 580.00 581.00 17
2014-09-22 Cement Squeeze 580.00 581.00 0
2014-09-22 Cement Plug 544.50 598.00 0
2014-09-23 Perforation 474.00 475.00 17
2014-11-07 Perforation 449.00 450.00 17
2014-11-07 Cement Squeeze 449.00 450.00 0
2014-11-07 Packing Device Capped w/Cement 390.00 440.00 0
2014-11-27 Perforation 321.00 322.00 17
2014-11-28 Cement Squeeze 321.00 322.00 0
1955-06-13 Acid Wash 1725.20 1828.80 0
2014-11-28 Cement Plug 339.70 395.50 0
2014-12-02 Perforation 228.00 229.00 17
2014-12-03 Cement Squeeze 228.00 229.00 0
2014-12-03 Cement Plug 191.00 249.00 0
2015-06-26 Perforation 127.00 128.00 20
2015-06-26 Perforation 127.00 128.00 17
2015-06-30 Cement Plug 100.00 128.00 0
2015-07-02 Perforation 77.00 78.00 17
2015-07-03 Cement Squeeze 77.00 78.00 0
1957-03-03 Acid Wash 1822.70 1871.50 0
1957-03-04 Acid Wash 1786.10 1819.70 0
1957-03-09 Open Hole/Barefoot Completion 1782.20 1871.50 0
1958-05-01 Open Hole/Barefoot Completion 1767.20 1854.70 0
2014-09-09 Packing Device Capped w/Cement 1746.00 1754.00 0
2014-09-09 Perforation 1525.00 1526.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-05 No Incident Encountered 0.00 0.00
2015-07-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References