X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263501002

Well Details

Well ID: 0504263501002
Loading map...
Location: 00/01-35-050-26W4/2
Location Alias: 00/01-35-50-26 W4M
Location Alias 2: 00/01-35-050-26 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 35
County/Municipality: Edmonton
Well Name: IMP UD3 87 LEDUC 1-35MU-50-26
Operator Name: Imperial Oil Resources Limited
License Number: B0002191
License Date: 1948-07-12
License Status: Re-Entered
Spud Date: 1948-08-01
Final Drill Date: 1948-08-29
Well Total Depth: 1617.60 m
Surface Hole Latitude: 53.354089
Surface Hole Longitude: -113.686902

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-07-12 Obtained License
1948-08-21 Drill Stem Test Performed
1948-08-29 Finished Drilling
1948-08-29 Well Mode changed to Drilled and Cased
1948-09-01 Production Casing Operation Performed
1948-09-05 Perforation Treatment Performed - Bullet Perforation
1965-03-03 Perforation Treatment Performed - Jet Perforation
1965-10-05 Well Began Production
1965-10-05 Well Fluid changed to Gas
1965-10-05 Well Mode changed to Flowing
1972-01-31 Well Fluid changed to Gas
1972-01-31 Well Mode changed to Suspended
1995-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-27 Perforation Treatment Performed - Cement Squeeze
1995-02-27 Plug Back Performed
1995-02-28 Perforation Treatment Performed - Jet Perforation
1995-02-28 Perforation Treatment Performed - Remedial Casing
1995-02-28 Well Log Performed
1995-03-01 Perforation Treatment Performed - Jet Perforation
1995-06-27 Perforation Treatment Performed - Remedial Casing
1995-06-27 Well Fluid changed to Gas
1995-06-27 Well Mode changed to Abandoned and Re-entered
1995-07-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-09-05 Bullet Perforation 1613.30 1614.80 23
1995-03-01 Perforation 160.00 161.00 13
1995-06-27 Remedial Casing Cementing 160.00 161.00 0
1965-03-03 Perforation 1276.50 1278.30 7
1965-03-03 Perforation 1274.10 1275.60 7
1965-03-03 Perforation 1261.30 1262.80 7
1965-03-03 Perforation 1254.30 1258.20 7
1995-02-27 Packing Device Capped w/Cement 1606.00 1606.00 0
1995-02-27 Cement Squeeze 1254.30 1278.30 0
1995-02-28 Perforation 580.00 581.00 13
1995-02-28 Remedial Casing Cementing 580.00 581.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 3123 0.0 0.0 0.0
1970 192 0.0 0.0 0.0

For data sources see[5]

References