X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263611000

Well Details

Well ID: 0504263611000
Loading map...
Location: 00/11-36-050-26W4/0
Location Alias: 00/11-36-50-26 W4M
Location Alias 2: 00/11-36-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 36
County/Municipality: Edmonton
Well Name: IMPERIAL LEDUC NO. 329
Operator Name: Imperial Oil Resources Limited
License Number: 0002564
License Date: 1951-01-24
License Status: RecCertified
Spud Date: 1951-03-13
Final Drill Date: 1951-04-10
Well Total Depth: 1614.20 m
Surface Hole Latitude: 53.360922
Surface Hole Longitude: -113.675416

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-01-24 Obtained License
1951-04-03 Drill Stem Test Performed
1951-04-04 Drill Stem Test Performed
1951-04-05 Liner Casing Operation Performed
1951-04-10 Finished Drilling
1951-04-10 Well Mode changed to Drilled and Cased
1951-04-14 Perforation Treatment Performed - Acid Wash - No Pressure
1951-04-14 Perforation Treatment Performed - Bullet Perforation
1951-04-18 Well Began Production
1951-04-18 Well Fluid changed to Crude Oil
1951-04-18 Well Mode changed to Flowing
1977-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-28 Well Fluid changed to Crude Oil
1978-06-28 Well Mode changed to Pumping
1984-06-13 Perforation Treatment Performed - Cement Squeeze
1984-06-13 Well Log Performed
1984-06-15 Well Log Performed
1984-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-18 Perforation Treatment Performed - Jet Perforation
1989-04-17 Well Fluid changed to Crude Oil
1989-04-17 Well Mode changed to Suspended
1992-01-28 Well Log Performed
1993-02-11 Well Log Performed
1993-08-18 Well Log Performed
1996-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-01 Perforation Treatment Performed - Jet Perforation
1996-11-01 Plug Back Performed
1996-11-01 Well Fluid changed to Crude Oil
1996-11-01 Well Log Performed
1996-11-01 Well Mode changed to Abandoned Zone
1997-03-25 Perforation Treatment Performed - Remedial Casing
1997-06-04 Well Abandoned
1997-06-04 Well Fluid changed to Crude Oil
1997-06-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-04-14 Bullet Perforation 1610.60 1612.10 13
1997-03-25 Remedial Casing Cementing 160.00 161.00 0
1951-04-14 Acid Wash 1610.60 1612.10 0
1977-11-15 Acid Treatment 1610.60 1612.10 0
1984-06-13 Cement Squeeze 1610.60 1612.10 0
1984-06-18 Perforation 1609.80 1610.00 3
1984-06-18 Acid Treatment 1609.80 1610.00 0
1996-11-01 Packing Device Capped w/Cement 1556.00 1564.00 0
1996-11-01 Packing Device Capped w/Cement 1192.00 1200.00 0
1996-11-01 Perforation 160.00 161.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8564 0.0 0.0 0.0
1968 8254 0.0 0.0 0.0
1969 3623 0.0 0.0 0.0
1970 6365 0.0 0.0 0.0
1971 7900 0.0 0.0 0.0
1972 7940 0.0 0.0 0.0
1973 8404 0.0 0.0 0.0
1974 7981 0.0 0.0 0.0
1975 8297 0.0 0.0 0.0
1976 8591 0.0 0.0 0.0
1977 8446 0.0 0.0 0.0
1978 7856 0.0 0.0 0.0
1979 8307 0.0 0.0 0.0
1980 8494 0.0 0.0 0.0
1981 8015 0.0 0.0 0.0
1982 7996 0.0 0.0 0.0
1983 8350 0.0 0.0 0.0
1984 4269 0.0 0.0 0.0
1985 8177 0.0 0.0 0.0
1986 8151 0.0 0.0 0.0
1987 8294 0.0 0.0 0.0
1988 4806 0.0 0.0 0.0
1989 900 0.0 0.0 0.0

For data sources see[5]

References