If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505042809000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.352765,"lon":-114.519151,"icon":""}]} |
Location: 00/09-28-050-04W5/0 | |
Location Alias: 00/09-28-50-04 W5M | |
Location Alias 2: 00/09-28-050-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 04 | |
Section: 28 | |
County/Municipality: Parkland County | |
Well Name: NEW STAR HZ HIGHVALE 9-28-50-4 | |
Operator Name: New Star Energy Ltd. | |
License Number: 0463203 | |
License Date: 2013-12-31 | |
License Status: Issued | |
Spud Date: 2014-01-09 | |
Final Drill Date: 2014-01-19 | |
Well Total Depth: 2242.00 m | |
Surface Hole Latitude: 53.352765 | |
Surface Hole Longitude: -114.519151 |
Date | Event |
---|---|
2013-12-31 | Obtained License |
2014-01-10 | Surface Casing Operation Performed |
2014-01-13 | Direction Drilling Operation Performed - Deviate |
2014-01-15 | Direction Drilling Operation Performed - Horizontal |
2014-01-17 | Intermediate Casing Operation Performed |
2014-01-19 | Finished Drilling |
2014-01-19 | Well Mode changed to Drilled and Cased |
2014-01-20 | Well Log Performed |
2014-01-21 | Rig Released |
2014-02-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-02-03 | Perforation Treatment Performed - Open-Hole Completion |
2014-02-08 | Well Began Production |
2014-02-08 | Well Fluid changed to Crude Oil |
2014-02-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-01-09 | Beaver Drilling Ltd. | 12 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-01-13 | 1300.90 | Deviate (5 - 79 degrees) |
2014-01-15 | 1682.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-02-03 | Open Hole/Barefoot Completion | 1757.00 | 2242.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2082.00 | 2092.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2067.00 | 2077.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2052.00 | 2062.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2037.00 | 2047.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2022.00 | 2032.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2007.00 | 2017.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1992.00 | 2002.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1977.00 | 1987.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1962.00 | 1972.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1947.00 | 1957.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2202.00 | 2212.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1932.00 | 1942.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1917.00 | 1927.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1902.00 | 1912.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1887.00 | 1897.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1872.00 | 1882.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1857.00 | 1867.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1842.00 | 1852.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1827.00 | 1837.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1812.00 | 1822.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1797.00 | 1807.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2187.00 | 2197.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1782.00 | 1792.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1767.00 | 1777.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 1757.00 | 1767.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2172.00 | 2182.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2157.00 | 2167.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2142.00 | 2152.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2127.00 | 2137.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2112.00 | 2122.00 | 0 |
2014-02-03 | Multi-Stage Fracture | 2097.00 | 2107.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-02-03 | 2014-02-03 | 1,593 | 20 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric acid | 7647-01-0 | 100 | 83.3479 | N/A | |||
Hydrochloric acid dilution water | Not Available | 100 | 83.3479 | N/A | ||||
Water | Not Available | 100 | 54.8785 | N/A | ||||
DAP-111 | Calfrac | Corrosion Inhibitor | Hydroxylated hydrocarbon | 8676 | 100 | 0.0725 | N/A | |
Inorganic salt | 8676 | 100 | 0.0725 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0725 | N/A | ||||
DAP-121 | Calfrac | Demulsifier | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0821 | N/A | |
Sulfonated hydrocarbon | 8691 | 100 | 0.0821 | N/A | ||||
DAP-131 | Calfrac | Demulsifier | 2-Propanol | 67-63-0 | 100 | 0.4198 | N/A | |
Inorganic acid | 8692 | 100 | 0.4198 | N/A | ||||
Sulfonated hydrocarbon | 8692 | 100 | 0.4198 | N/A | ||||
DWP-602 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0916 | N/A | |
DAP-101 | Calfrac | Iron Control | 2-Mercaptoethanol | 60-24-2 | 100 | 0.9833 | N/A | |
Copper chloride | 7447-39-4 | 100 | 0.9833 | N/A | ||||
Ethanolamine | 141-43-5 | 100 | 0.9833 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.9833 | N/A | ||||
Water | 7732-18-5 | 100 | 0.9833 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-01-24 | 2014-02-17 | Central Water Distribution Facility | 40 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 7606 | 0.0 | 0.0 | 0.0 |
2015 | 8398 | 0.0 | 0.0 | 0.0 |
2016 | 5711 | 0.0 | 0.0 | 0.0 |
2017 | 1504 | 0.0 | 0.0 | 0.0 |
2018 | 8322 | 0.0 | 0.0 | 0.0 |
2019 | 6287 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-01-21 | No Incident Encountered | 0.00 | 0.00 |
2014-02-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]