X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505061116000

Well Details

Well ID: 0505061116000
Loading map...
Location: 00/16-11-050-06W5/0
Location Alias: 00/16-11-50-06 W5M
Location Alias 2: 00/16-11-050-06 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 06
Section: 11
County/Municipality: Brazeau County
Well Name: DAYLIGHT PEMBINA 16-11-50-6
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0415202
License Date: 2009-12-04
License Status: Issued
Spud Date: 2009-12-10
Final Drill Date: 2009-12-17
Well Total Depth: 2515.00 m
Surface Hole Latitude: 53.307959
Surface Hole Longitude: -114.778644

For data sources see[1][2]

Well History

Date Event
2009-12-04 Obtained License
2009-12-11 Surface Casing Operation Performed
2009-12-14 Direction Drilling Operation Performed - Deviate
2009-12-14 Well Log Performed
2009-12-15 Direction Drilling Operation Performed - Horizontal
2009-12-17 Finished Drilling
2009-12-17 Well Log Performed
2009-12-17 Well Mode changed to Drilled and Cased
2009-12-19 Production Casing Operation Performed
2009-12-19 Rig Released
2009-12-19 Well Log Performed
2010-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2010-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2010-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2010-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-01 Well Began Production
2010-04-01 Well Fluid changed to Crude Oil
2010-04-01 Well Mode changed to Flowing
2014-11-01 Well Fluid changed to Crude Oil
2014-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-14 1025.00 Deviate (5 - 79 degrees)
2009-12-15 1334.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-26 Multi-Stage Fracture 2497.80 2498.20 0
2010-01-28 Multi-Stage Fracture 2005.40 2005.80 0
2010-01-28 Multi-Stage Fracture 1950.50 1950.90 0
2010-01-29 Multi-Stage Fracture 1895.70 1896.10 0
2010-01-29 Multi-Stage Fracture 1840.80 1841.20 0
2010-01-29 Multi-Stage Fracture 1787.20 1787.60 0
2010-01-29 Multi-Stage Fracture 1732.50 1732.80 0
2010-02-01 Multi-Stage Fracture 1677.90 1678.30 0
2010-02-01 Multi-Stage Fracture 1623.40 1623.80 0
2010-02-01 Multi-Stage Fracture 1568.60 1568.90 0
2010-02-01 Multi-Stage Fracture 1514.40 1514.70 0
2010-01-26 Multi-Stage Fracture 2443.10 2443.50 0
2010-02-01 Multi-Stage Fracture 1459.80 1460.20 0
2010-02-01 Multi-Stage Fracture 1417.30 1417.70 0
2010-02-01 Multi-Stage Fracture 1374.80 1375.20 0
2010-01-26 Multi-Stage Fracture 2388.70 2389.10 0
2010-01-27 Multi-Stage Fracture 2334.00 2334.30 0
2010-01-27 Multi-Stage Fracture 2279.30 2279.70 0
2010-01-27 Multi-Stage Fracture 2224.40 2224.80 0
2010-01-27 Multi-Stage Fracture 2169.70 2170.00 0
2010-01-28 Multi-Stage Fracture 2114.90 2115.30 0
2010-01-28 Multi-Stage Fracture 2060.00 2060.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5240 0.0 0.0 0.0
2011 8647 0.0 0.0 0.0
2012 8399 0.0 0.0 0.0
2013 8348 0.0 0.0 0.0
2014 8470 0.0 0.0 0.0
2015 7754 0.0 0.0 0.0
2016 8552 0.0 0.0 0.0
2017 3300 0.0 0.0 0.0
2018 2184 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-02-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References