X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505062613000

Well Details

Well ID: 0505062613000
Loading map...
Location: 00/13-26-050-06W5/0
Location Alias: 00/13-26-50-06 W5M
Location Alias 2: 00/13-26-050-06 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 06
Section: 26
County/Municipality: Parkland County
Well Name: DAYLIGHT HZ PEMBINA 13-26-50-6
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0422905
License Date: 2010-08-24
License Status: Abandoned
Spud Date: 2010-10-06
Final Drill Date: 2010-10-16
Well Total Depth: 2624.00 m
Surface Hole Latitude: 53.339320
Surface Hole Longitude: -114.784292

For data sources see[1][2]

Well History

Date Event
2010-08-24 Obtained License
2010-10-07 Surface Casing Operation Performed
2010-10-08 Direction Drilling Operation Performed - Horizontal
2010-10-09 Well Log Performed
2010-10-13 Intermediate Casing Operation Performed
2010-10-16 Finished Drilling
2010-10-16 Well Mode changed to Drilled and Cased
2010-10-18 Liner Casing Operation Performed
2010-10-18 Rig Released
2010-11-03 Well Log Performed
2010-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-19 Perforation Treatment Performed - Open-Hole Completion
2010-11-28 Well Began Production
2010-11-28 Well Fluid changed to Crude Oil
2010-11-28 Well Mode changed to Pumping
2012-03-08 Well Fluid changed to Crude Oil
2012-03-08 Well Mode changed to Suspended
2016-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-07-31 Plug Back Performed
2016-07-31 Well Fluid changed to Crude Oil
2016-07-31 Well Mode changed to Abandoned Zone
2016-09-17 Well Abandoned
2016-09-17 Well Fluid changed to Crude Oil
2016-09-17 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-08 815.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-19 Open Hole/Barefoot Completion 2360.40 2624.00 0
2016-07-31 Packing Device Capped w/Cement 1281.00 1320.00 0
2010-11-19 Multi-Stage Fracture 2303.60 2303.70 0
2010-11-19 Multi-Stage Fracture 2144.00 2144.10 0
2010-11-19 Multi-Stage Fracture 1842.40 1842.50 0
2010-11-19 Multi-Stage Fracture 1778.80 1778.90 0
2010-11-19 Multi-Stage Fracture 1712.00 1712.10 0
2010-11-19 Multi-Stage Fracture 1648.90 1649.00 0
2010-11-19 Multi-Stage Fracture 1594.90 1595.00 0
2010-11-19 Multi-Stage Fracture 1449.80 1449.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-11-19 No Incident Encountered 0.00 0.00
2016-08-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References