If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0505072008000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.328784,"lon":-114.979849,"icon":""}]} |
| Location: 00/08-20-050-07W5/0 | |
| Location Alias: 00/08-20-50-07 W5M | |
| Location Alias 2: 00/08-20-050-07 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 5 | |
| Range: 07 | |
| Section: 20 | |
| County/Municipality: Brazeau County | |
| Well Name: PAN AM D-31 LOB 8-20-50-7 | |
| Operator Name: BP Canada Energy Group ULC | |
| License Number: 0017893 | |
| License Date: 1959-10-06 | |
| License Status: RecCertified | |
| Spud Date: 1959-10-13 | |
| Final Drill Date: 1959-10-22 | |
| Well Total Depth: 1402.10 m | |
| Surface Hole Latitude: 53.328784 | |
| Surface Hole Longitude: -114.979849 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1959-10-06 | Obtained License |
| 1959-10-22 | Finished Drilling |
| 1959-10-22 | Well Mode changed to Drilled and Cased |
| 1959-10-24 | Production Casing Operation Performed |
| 1959-10-26 | Perforation Treatment Performed - Fractured |
| 1959-10-26 | Perforation Treatment Performed - Jet Perforation |
| 1959-11-18 | Well Began Production |
| 1959-11-18 | Well Fluid changed to Crude Oil |
| 1959-11-18 | Well Mode changed to Pumping |
| 1959-12-16 | Perforation Treatment Performed - Fractured |
| 1960-03-04 | Well Fluid changed to Crude Oil |
| 1960-03-04 | Well Mode changed to Suspended |
| 1965-11-08 | Perforation Treatment Performed - Cement Plug |
| 1965-12-07 | Well Abandoned |
| 1965-12-07 | Well Fluid changed to Crude Oil |
| 1965-12-07 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1959-10-26 | Perforation | 1370.40 | 1374.60 | 13 |
| 1959-10-26 | Fracture | 1370.40 | 1374.60 | 0 |
| 1959-12-16 | Fracture | 1370.40 | 1374.60 | 0 |
| 1965-11-08 | Cement Plug | 1342.90 | 1390.80 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]