X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505080116020

Well Details

Well ID: 0505080116020
Loading map...
Location: 02/16-01-050-08W5/0
Location Alias: 02/16-01-50-08 W5M
Location Alias 2: 02/16-01-050-08 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 08
Section: 01
County/Municipality: Brazeau County
Well Name: PENN WEST 102 HZ PEMBINA 16-1-50-8
Operator Name: Obsidian Energy Ltd.
License Number: 0473675
License Date: 2014-12-19
License Status: Issued
Spud Date: 2015-02-08
Final Drill Date: 2015-02-14
Well Total Depth: 3797.00 m
Surface Hole Latitude: 53.292375
Surface Hole Longitude: -115.065637

For data sources see[1][2]

Well History

Date Event
2014-12-19 Obtained License
2015-02-08 Surface Casing Operation Performed
2015-02-10 Direction Drilling Operation Performed - Deviate
2015-02-10 Direction Drilling Operation Performed - Horizontal
2015-02-10 Well Log Performed
2015-02-14 Finished Drilling
2015-02-14 Well Log Performed
2015-02-14 Well Mode changed to Drilled and Cased
2015-02-15 Production Casing Operation Performed
2015-02-15 Rig Released
2015-03-03 Well Log Performed
2015-03-09 Well Began Production
2015-03-09 Well Fluid changed to Crude Oil
2015-03-09 Well Mode changed to Flowing
2015-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-10 Perforation Treatment Performed - Open-Hole Completion
2015-04-06 Well Fluid changed to Crude Oil
2015-04-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-02-08 Precision Drilling Corporation 148 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-02-10 1192.00 Deviate (5 - 79 degrees)
2015-02-10 1583.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-03-10 Open Hole/Barefoot Completion 3790.00 3797.00 0
2015-03-10 Multi-Stage Fracture 3067.90 3068.00 0
2015-03-10 Multi-Stage Fracture 2971.60 2971.70 0
2015-03-10 Multi-Stage Fracture 2889.20 2889.30 0
2015-03-10 Multi-Stage Fracture 2806.80 2806.90 0
2015-03-10 Multi-Stage Fracture 2724.30 2724.40 0
2015-03-10 Multi-Stage Fracture 2641.50 2641.60 0
2015-03-10 Multi-Stage Fracture 2544.90 2545.00 0
2015-03-10 Multi-Stage Fracture 2463.40 2463.50 0
2015-03-10 Multi-Stage Fracture 2380.50 2380.60 0
2015-03-10 Multi-Stage Fracture 2297.80 2297.90 0
2015-03-10 Multi-Stage Fracture 3741.40 3741.50 0
2015-03-10 Multi-Stage Fracture 2201.20 2201.30 0
2015-03-10 Multi-Stage Fracture 2118.30 2118.40 0
2015-03-10 Multi-Stage Fracture 2036.90 2037.00 0
2015-03-10 Multi-Stage Fracture 1954.40 1954.50 0
2015-03-10 Multi-Stage Fracture 1860.40 1860.50 0
2015-03-10 Multi-Stage Fracture 1779.30 1779.40 0
2015-03-10 Multi-Stage Fracture 1696.90 1697.00 0
2015-03-10 Multi-Stage Fracture 3658.80 3658.90 0
2015-03-10 Multi-Stage Fracture 3576.40 3576.50 0
2015-03-10 Multi-Stage Fracture 3493.70 3493.80 0
2015-03-10 Multi-Stage Fracture 3399.00 3399.10 0
2015-03-10 Multi-Stage Fracture 3316.10 3316.20 0
2015-03-10 Multi-Stage Fracture 3233.40 3233.50 0
2015-03-10 Multi-Stage Fracture 3150.60 3150.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-10 2015-03-10 1,462 2,634 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.0576 N/A
water Not Available 100 81.7072 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 14.9287 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0102 N/A
dibromoacetonitrile 3252-43-5 100 0.0102 N/A
non-hazardous ingredients Not Available 100 0.0102 N/A
polyethylene glycol 25322-68-3 100 0.0102 N/A
sodium bromide 7647-15-6 100 0.0102 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0086 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1348 N/A
non-hazardous ingredients Not Available 100 0.1348 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0449 N/A
propylene glycol 57-55-6 100 0.0449 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.1076 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.1076 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1076 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-03-08 2015-03-10 Surface Water - Runoff 3408

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6010 0.0 0.0 0.0
2016 8236 0.0 0.0 0.0
2017 8271 0.0 0.0 0.0
2018 8244 0.0 0.0 0.0
2019 8436 0.0 0.0 0.0
2020 1881 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-15 No Incident Encountered 0.00 0.00
2015-03-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References