X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505090104000

Well Details

Well ID: 0505090104000
Loading map...
Location: 00/04-01-050-09W5/0
Location Alias: 00/04-01-50-09 W5M
Location Alias 2: 00/04-01-050-09 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 09
Section: 01
County/Municipality: Brazeau County
Well Name: AMOCO PEM 4-1-50-9
Operator Name: Obsidian Energy Ltd.
License Number: 0024193
License Date: 1963-05-24
License Status: RecCertified
Spud Date: 1963-06-02
Final Drill Date: 1963-06-10
Well Total Depth: 1488.90 m
Surface Hole Latitude: 53.281308
Surface Hole Longitude: -115.193388

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-05-24 Obtained License
1963-06-10 Finished Drilling
1963-06-10 Production Casing Operation Performed
1963-06-10 Well Mode changed to Drilled and Cased
1963-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-12 Perforation Treatment Performed - Fractured
1963-06-12 Perforation Treatment Performed - Jet Perforation
1963-06-26 Well Began Production
1963-06-26 Well Fluid changed to Crude Oil
1963-06-26 Well Mode changed to Flowing
1976-05-11 Well Fluid changed to Crude Oil
1976-05-11 Well Mode changed to Pumping
1993-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-25 Perforation Treatment Performed - Jet Perforation
1993-08-25 Plug Back Performed
1993-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-26 Perforation Treatment Performed - Remedial Casing
1993-08-26 Well Fluid changed to Crude Oil
1993-08-26 Well Mode changed to Abandoned
1993-08-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-06-12 Perforation 1465.20 1466.40 3
1993-08-26 Packing Device Capped w/Cement 273.00 375.00 0
1963-06-12 Perforation 1467.60 1468.20 3
1963-06-12 Perforation 1468.80 1469.40 3
1963-06-12 Perforation 1472.20 1472.50 3
1963-06-12 Acid Treatment 1465.20 1472.50 0
1963-06-12 Fracture 1465.20 1472.50 0
1993-08-25 Packing Device Capped w/Cement 1447.00 1455.00 0
1993-08-25 Perforation 364.00 365.00 13
1993-08-26 Remedial Casing Cementing 364.00 365.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8326 0.0 0.0 0.0
1968 8710 0.0 0.0 0.0
1969 8241 0.0 0.0 0.0
1970 8716 0.0 0.0 0.0
1971 8709 0.0 0.0 0.0
1972 8565 0.0 0.0 0.0
1973 8624 0.0 0.0 0.0
1974 8644 0.0 0.0 0.0
1975 8461 0.0 0.0 0.0
1976 8423 0.0 0.0 0.0
1977 8590 0.0 0.0 0.0
1978 8593 0.0 0.0 0.0
1979 8313 0.0 0.0 0.0
1980 7967 0.0 0.0 0.0
1981 8014 0.0 0.0 0.0
1982 8548 0.0 0.0 0.0
1983 8327 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 6192 0.0 0.0 0.0
1988 936 0.0 0.0 0.0

For data sources see[5]

References