If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505091503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.311415,"lon":-115.272725,"icon":""}]} |
Location: 00/03-15-050-09W5/0 | |
Location Alias: 00/03-15-50-09 W5M | |
Location Alias 2: 00/03-15-050-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 09 | |
Section: 15 | |
County/Municipality: Brazeau County | |
Well Name: RIDGEBACK PEMBINA 3-15-50-9 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0457736 | |
License Date: 2013-06-26 | |
License Status: Issued | |
Spud Date: 2013-08-03 | |
Final Drill Date: 2013-08-15 | |
Well Total Depth: 4005.00 m | |
Surface Hole Latitude: 53.311415 | |
Surface Hole Longitude: -115.272725 |
Date | Event |
---|---|
2013-06-26 | Obtained License |
2013-08-03 | Kick Occurred |
2013-08-03 | Surface Casing Operation Performed |
2013-08-07 | Direction Drilling Operation Performed - Deviate |
2013-08-09 | Direction Drilling Operation Performed - Horizontal |
2013-08-15 | Finished Drilling |
2013-08-15 | Well Log Performed |
2013-08-15 | Well Mode changed to Drilled and Cased |
2013-08-17 | Production Casing Operation Performed |
2013-08-18 | Perforation Treatment Performed - Open-Hole Completion |
2013-08-18 | Rig Released |
2013-09-06 | Well Log Performed |
2013-09-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-09-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-09-15 | Well Began Production |
2013-09-15 | Well Fluid changed to Crude Oil |
2013-09-15 | Well Mode changed to Flowing |
2013-09-17 | Well Log Performed |
2013-10-15 | Well Fluid changed to Crude Oil |
2013-10-15 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-08-03 | Precision Drilling Corporation | 403 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-08-07 | 1130.00 | Deviate (5 - 79 degrees) |
2013-08-09 | 1513.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-08-18 | Open Hole/Barefoot Completion | 4000.50 | 4005.00 | 0 |
2013-09-14 | Multi-Stage Fracture | 3401.60 | 3401.70 | 0 |
2013-09-14 | Multi-Stage Fracture | 3339.60 | 3339.70 | 0 |
2013-09-14 | Multi-Stage Fracture | 3263.00 | 3263.10 | 0 |
2013-09-14 | Multi-Stage Fracture | 3200.90 | 3201.00 | 0 |
2013-09-14 | Multi-Stage Fracture | 3124.40 | 3124.50 | 0 |
2013-09-14 | Multi-Stage Fracture | 3047.70 | 3047.80 | 0 |
2013-09-14 | Multi-Stage Fracture | 2986.50 | 2986.60 | 0 |
2013-09-14 | Multi-Stage Fracture | 2909.60 | 2909.70 | 0 |
2013-09-14 | Multi-Stage Fracture | 2832.70 | 2832.80 | 0 |
2013-09-15 | Multi-Stage Fracture | 2770.20 | 2770.30 | 0 |
2013-09-14 | Multi-Stage Fracture | 3976.60 | 3976.70 | 0 |
2013-09-15 | Multi-Stage Fracture | 2693.00 | 2693.10 | 0 |
2013-09-15 | Multi-Stage Fracture | 2630.80 | 2630.90 | 0 |
2013-09-15 | Multi-Stage Fracture | 2554.10 | 2554.20 | 0 |
2013-09-15 | Multi-Stage Fracture | 2477.00 | 2477.10 | 0 |
2013-09-15 | Multi-Stage Fracture | 2414.30 | 2414.40 | 0 |
2013-09-15 | Multi-Stage Fracture | 2337.00 | 2337.10 | 0 |
2013-09-15 | Multi-Stage Fracture | 2274.50 | 2274.60 | 0 |
2013-09-15 | Multi-Stage Fracture | 2197.70 | 2197.80 | 0 |
2013-09-15 | Multi-Stage Fracture | 2135.40 | 2135.50 | 0 |
2013-09-15 | Multi-Stage Fracture | 2058.50 | 2058.60 | 0 |
2013-09-14 | Multi-Stage Fracture | 3909.30 | 3909.40 | 0 |
2013-09-15 | Multi-Stage Fracture | 1981.50 | 1981.60 | 0 |
2013-09-15 | Multi-Stage Fracture | 1919.00 | 1919.10 | 0 |
2013-09-15 | Multi-Stage Fracture | 1842.30 | 1842.40 | 0 |
2013-09-15 | Multi-Stage Fracture | 1780.10 | 1780.20 | 0 |
2013-09-14 | Multi-Stage Fracture | 3832.70 | 3832.80 | 0 |
2013-09-14 | Multi-Stage Fracture | 3755.50 | 3755.60 | 0 |
2013-09-14 | Multi-Stage Fracture | 3692.80 | 3692.90 | 0 |
2013-09-14 | Multi-Stage Fracture | 3616.20 | 3616.30 | 0 |
2013-09-14 | Multi-Stage Fracture | 3554.80 | 3554.90 | 0 |
2013-09-14 | Multi-Stage Fracture | 3478.30 | 3478.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-14 | 2013-09-15 | 1,519 | 3,199 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.0542 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.944 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.5847 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.4485 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0149 | N/A | |
Water | 7732-18-5 | 100 | 0.0158 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1946 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0904 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0926 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0904 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1143 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0904 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0924 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0926 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 3.118 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0666 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-09-14 | 2013-09-15 | Surface Water - Lake | 3178 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 1903 | 0.0 | 0.0 | 0.0 |
2014 | 8423 | 0.0 | 0.0 | 0.0 |
2015 | 8409 | 0.0 | 0.0 | 0.0 |
2016 | 8584 | 0.0 | 0.0 | 0.0 |
2017 | 8709 | 0.0 | 0.0 | 0.0 |
2018 | 8400 | 0.0 | 0.0 | 0.0 |
2019 | 8480 | 0.0 | 0.0 | 0.0 |
2020 | 1978 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-08-03 | Kick | 78.00 | 78.00 |
2013-09-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]